Results for prøvespændingen translation from Danish to English

Computer translation

Trying to learn how to translate from the human translation examples.

Danish

English

Info

Danish

prøvespændingen

English

 

From: Machine Translation
Suggest a better translation
Quality:

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

Danish

English

Info

Danish

prøvespændingen skal påføres i 1 minut.

English

the time of application of the test voltage shall be 1 min.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

prøvespændingen for svagstrømskredse skal være utest = 750 v ac.

English

the test voltage for low voltage circuits shall be utest = 750 v ac.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

prøvespændingen skal være i overensstemmelse med regulativets punkt 6.2.3.

English

the test voltage shall be as specified in paragraph 6.2.3 of the regulation;

Last Update: 2014-11-21
Usage Frequency: 3
Quality:

Danish

prøvespændingen skal være vekselstrøm med en frekvens på 50 hz og tilnærmelsesvis sinusformet.

English

the test voltage shall be ac with a frequency of 50 hz and approximately sinusoidal form.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

medmindre andet er angivet, foretages elektriske og fotometriske målinger ved prøvespændingen.

English

unless otherwise specified, electrical and photometric measurements shall be carried out at the test voltage.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

denne skal opnås inden for de specificerede tolerancer, når gasudladningslyskilden tilføres strøm ved prøvespændingen.

English

to be achieved, within the specified tolerances, when the gas-discharge light source is energized by the ballast operated at test voltage.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

forud for indledningen af en prøvning skal glødelampens temperatur stabiliseres ved drift ved prøvespændingen i 10 minutter.

English

before starting a test, the stabilisation of the temperature of the filament lamp shall be obtained by operating at test voltage for 10 minutes.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

lyskilden tændes og betjenes med den elektroniske lyskilderegulering ved prøvespændingen i en periode på 15 minutter.

English

the light source shall be started and be operated with the electronic light source control-gear at test voltage for a period of 15 minutes.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

glødetrådenes placering og dimensioner måles, mens glødelamperne tilføres strøm ved 90-100 % af prøvespændingen.

English

the position and dimensions of the filament shall be measured with the filament lamps being supplied with current at from 90 per cent to 100 per cent of the test voltage.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

målingen foretages ved hjælp af optiske metoder gennem den transparente kappe efter ældning med den lyskilde, der leveres af den elektroniske lyskilderegulering ved prøvespændingen.

English

the measurement shall be made using optical methods through the transparent envelope, after ageing with the light source supplied by the electronic light source control-gear at test voltage.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Danish

prøvespænding

English

test voltage

Last Update: 2017-02-08
Usage Frequency: 16
Quality:

Reference: Translated.com

Get a better translation with
7,747,244,647 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK