Results for rhj 096 translation from English to Arabic

Computer translation

Trying to learn how to translate from the human translation examples.

English

Arabic

Info

English

rhj 096

Arabic

 

From: Machine Translation
Suggest a better translation
Quality:

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Arabic

Info

English

[gg 096]

Arabic

[غ 096]

Last Update: 2017-08-29
Usage Frequency: 1
Quality:

Reference: Anonymous

English

1965 096 a

Arabic

1965 096 a

Last Update: 2016-12-02
Usage Frequency: 1
Quality:

Reference: Anonymous

English

undt/2009/096

Arabic

undt/2009/096

Last Update: 2016-12-01
Usage Frequency: 2
Quality:

Reference: Anonymous

English

11 458 096 b

Arabic

٠٩٦ ٤٥٨ ١١)ب(

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Anonymous

English

tel 096 4612159 fax

Arabic

tel 096 4612159 fax

Last Update: 2016-12-02
Usage Frequency: 3
Quality:

Reference: Anonymous

English

fan performance data - 096

Arabic

البيانات الفنية للمروحة - 096

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

isbn 88-7205-096-0.

Arabic

isbn 88-7205-096-0.

Last Update: 2016-03-03
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

096 7 miscellaneous equipment

Arabic

معدات متنوعة

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

` (#096;) grave accent

Arabic

& # 096; خطيرمميتالقبر نبرة

Last Update: 2011-10-23
Usage Frequency: 1
Quality:

Reference: Drkhateeb
Warning: Contains invisible HTML formatting

English

096. environment and sustainable development

Arabic

096-البيئة والتنمية المستدامة

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

january 1998 10 096 500 9 722 700

Arabic

كانون الثاني/يناير ١٩٩٨

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

096 brunei darussalam brunei darsm brn

Arabic

096 بروني دار السﻻم brunei darsm brn

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

payable on medical insurance premium 299 096

Arabic

اشتراكات صندوق المعاشات التقاعدية الواجبة الدفع

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

a/o no. 2009-096 barret m82 a1

Arabic

حساب مفتوح رقم 2009-096

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

of these, 5 096 of the cases led to legal action.

Arabic

ومن بين هذه القضايا اتخذت إجراءات قانونية في 096 5 قضية.

Last Update: 2016-12-02
Usage Frequency: 3
Quality:

Reference: Drkhateeb

English

(total budget $3,374,000) 3 096 700

Arabic

)مجموع الميزانية ٠٠٠ ٣٧٤ ٣ دوﻻر( ٠٠,٧٠٠ ٠٩٦ ٣

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

up to the end of march 2010, 1 096 young cssa recipients had participated in my step.

Arabic

وإلى حد نهاية آذار/مارس 2010، شارك 096 1 شاباً من المستفيدين من خطة مساعدات الضمان الاجتماعي الشاملة في البرنامج.

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

network connections (installations related to lan connectivity) 3 096 5 000 5 000

Arabic

التوصيـﻻت الشبكية )تركيبـات التوصيـل بالشبكة المحلية(

Last Update: 2016-12-01
Usage Frequency: 2
Quality:

Reference: Drkhateeb

English

3 phase motors used for belt drive models (096~180) are tefc.

Arabic

المحركات ثلاثية الطور المستخدمة في تشغيل الموديلات (096~180) بالسيور من فئة tefc.

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Drkhateeb

English

1. contractual and agreements: 1.1 main contract two contracts had been signed as shown here below for:  s1 / etwall / mep-002: o for an amount of 7,668,000 sar o 17 february 2019  s1 / etwall / mep-006: o for an amount of 10,500,000 sar o 20 august 2019 1.2 advance guarantee and performance bond: upon contracts’ signature, the below guarantees per agreements had been carried out:  advance guarantee for: o contract s1 / etwall / mep-002: 768,000 sar o contract s1 / etwall / mep-006: waved off on 30 september 2019 (attached)  performance guarantees per below information and that have been extended two times up till 31 december 2023: o ref no ert4193681:  amount: 525,000 sar  issue date :08-10-2019 o ref no ert4193104  amount: 383,400 sar  issue date: 16-04-2019 1.3 contract amendment the contracts s1 / etwall / mep-002 & s1 / etwall / mep-006 had then been amended as per below:  dated 08 august 2020  total amount: 23,500,000 sar 1.4 agreement upon amendment signature as per the amendment agreement, s1 shall apply no further and future deductions for previous inventory material and newly purchased materials from etwall balance invoicing. 2. variation orders and additional works during the construction phase evolution, additional works and reworks had been assigned to be carried out by etwall due to several reasons as attached within the variation orders’ summary for which works had been carried out with the consent and request of samsung s1 branch for which no feedback has been provided till date through the following sequence:  2,150,000 sar dated on 10 november 2021 (attached “re letter ref. tadawul-etwall-1121-085 - response to letter ref. tdw-s... (15.1 mb)”)  898,166.10 sar dated on 03 july 2022 following a meeting held on 14 june 2022 was agreed upon all parties for samsung s1 branch to have the variations related raised to the main client with no feedback (attached “s1 vo evaluation request --- s of meeting 14-06-2022 (23.4 kb)” & “tadawul tower - pending vo's - 2019 to 2022 (32.9 kb)”)  the submitted variations had been carried out based on site instructions that had been submitted by etwall for which samsung s1 branch had delayed providing back the signed copy by the main contractor “samsung jv”. o attached is a signed site instruction for reference for which etwall was able to receive a copy from the main client, samsung jv. attached are the letters related to:  the submitted vos: o attached “s1-vo's- financial updated report as per meeting 14-06-2022 (1)”  the supporting letters and work evidence and acknowledgement of the work done by samsung s1 branch o tadawul etwall0721-081 o tadawul etwall0721-082 o tadawul-etwall-0721-083 o tadawul-etwall-0721-084 o tadawul-etwall-0322-095 o tadawul-etwall-0422-096 o tadawul-etwall-0422-097 o tadawul-etwall-0322-098 o tadawul-etwall-0422-099 o tadawul-etwall-0522-100 o tadawul-etwall-0622-102 o tadawul-etwall-0622-103  the emails’ instructions and site reports submitted and that had been signed by the main contractor “fw_ tadawul - additional_rectification works vo-2_9_2021”: o fw vesda architecture diagram (240 kb) o fw(2) mtr odf cross connectivity (829 kb) o fwd fw fw re fw re re re re fw fw data hall -1 temperature an... (5.50 mb) o monitor modules to be installed as per latest (1.78 mb) 3 works completion and toc all along the site evolution, etwall has carried out the required scope of work under the contract agreement and provided standards with a complete receipt of the progress amount of works as per contract agreement following which etwall has requested samsung s1 branch for the toc however with feedbacks leading to a delay in receiving the toc noting that works remaining are snagging works that are to be considered out of the main execution scope of work for which a full progress had been settled. samsung s1 branch has received the toc from main contractor without issuing it back to etwall technology per contract clauses and agreement (back-to-back basis).  tadawul-etwall-2102-023-0120  tadawul project - request for toc letter 4 absence of constructive feedbacks. upon the receipt of the toc by samsung s1 branch, non-constructive feedbacks to our requests have taken place:  tadawul project was put on hold with the absence of the consultant due to the project handover to the main client  etwall has requested the toc for which feedback with snags has been provided noting that the systems concerned had been carried out and approved previously. 5 points of concern  approval of variation orders  issuance of toc  final and clear financial statement provision  payment plan

Arabic

1. العقود والاتفاقيات: 1.1 العقد الرئيسي تم توقيع عقدين كما هو موضح أدناه من أجل:  s1 / etwall / mep 002: o بمبلغ 7,668,000 ريال سعودي o 17 فبراير 2019  s1 / etwall / mep 006: o بمبلغ 10,500,000 ريال سعودي o 20 أغسطس 2019 1.2 الضمان المسبق وضمان الأداء: عند توقيع العقد، تم تنفيذ الضمانات التالية لكل اتفاقية:  ضمان مسبق ل: o عقد s1 / etwall / mep 002: 768,000 ريال سعودي o عقد s1 / etwall

Last Update: 2023-04-26
Usage Frequency: 1
Quality:

Reference: Anonymous
Warning: Contains invisible HTML formatting

Get a better translation with
7,726,343,100 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK