Results for formel 2 translation from German to Dutch

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

German

Dutch

Info

German

formel 2

Dutch

formule 2

Last Update: 2017-04-07
Usage Frequency: 51
Quality:

German

formel

Dutch

goed geformuleerde formule

Last Update: 2014-11-14
Usage Frequency: 1
Quality:

Reference: IATE

German

formel 2:hsb

Dutch

formule 2: hsb

Last Update: 2014-11-08
Usage Frequency: 1
Quality:

Reference: IATE

German

formel a

Dutch

formule a

Last Update: 2014-11-18
Usage Frequency: 1
Quality:

Reference: IATE

German

herz-formel

Dutch

formule van herz

Last Update: 2014-11-14
Usage Frequency: 1
Quality:

Reference: IATE

German

chemische formel

Dutch

brutoformule

Last Update: 2014-11-16
Usage Frequency: 3
Quality:

Reference: IATE

German

waldspaziergangs-formel

Dutch

boswandeling

Last Update: 2014-11-14
Usage Frequency: 1
Quality:

Reference: IATE

German

nach formel 2.1 der anlage 2

Dutch

overeenkomstig formule 2.1 van aanhangsel 2

Last Update: 2014-11-17
Usage Frequency: 1
Quality:

Reference: IATE

German

dieser wert wird mit der formel 2 berechnet;

Dutch

deze waarde wordt berekend met formule 2;

Last Update: 2014-11-08
Usage Frequency: 1
Quality:

Reference: IATE

German

(nach formel 4.1 der anlage 2 mit vlsoll)

Dutch

(volgens formule 4.1 van aanhangsel 2 met vlreference)

Last Update: 2014-11-17
Usage Frequency: 1
Quality:

Reference: IATE

German

dieser lässt sich anhand der nachstehenden formel berechnen [2]:

Dutch

deze fout kan worden berekend met de volgende formule [2]:

Last Update: 2014-11-07
Usage Frequency: 1
Quality:

Reference: IATE

German

der Übergangszeitraum ist nach der formel „2 plus 3 plus 2“ in drei phasen unterteilt.

Dutch

de overgangsperiode is verdeeld in drie afzonderlijke fasen overeenkomstig de "2 plus 3 plus 2"-formule.

Last Update: 2017-04-07
Usage Frequency: 1
Quality:

Reference: IATE
Warning: Contains invisible HTML formatting

German

2 berechnung der n-1-formel auf nationaler ebene

Dutch

2 bereken de n-1-formule op nationaal niveau;

Last Update: 2017-04-07
Usage Frequency: 1
Quality:

Reference: IATE

German

die gesamtübergangszeit von sieben jahren ist in drei phasen unterteilt (nach der formel „2 plus 3 plus 2“).

Dutch

de totale overgangsperiode van maximaal zeven jaar is verdeeld in drie afzonderlijke fasen (formule "2-plus-3-plus-2").

Last Update: 2017-04-07
Usage Frequency: 1
Quality:

Reference: IATE
Warning: Contains invisible HTML formatting

German

die gesamtübergangszeit von maximal sieben jahren ist in drei phasen unterteilt (nach der formel „2 plus 3 plus 2“).

Dutch

de totale overgangsperiode van maximaal zeven jaar wordt verdeeld in drie afzonderlijke fasen (formule “2-plus-3-plus-2”).

Last Update: 2017-04-07
Usage Frequency: 1
Quality:

Reference: IATE

German

der berichtskreis-totalwert Ŷ für das neugeschäft wird sodann mittels der folgenden allgemeinen formel( 2) geschätzt:

Dutch

de totale populatie Ŷ voor het bedrag aan nieuwe contracten wordt dan geschat met behulp van de volgende generieke formule( 2):

Last Update: 2012-03-19
Usage Frequency: 3
Quality:

Reference: IATE

German

wobei es sich bei den werten 0,25, 0,40, 0,25 und 0,1 um dieselben gewichtungswerte handelt wie in der formel 2 und s1800, s3000, s6000 und s10000 die nach der formel 3 berechneten standardabweichungen sind.

Dutch

waarbij de waarden 0,25, 0,40, 0,25, en 0,1 dezelfde wegingsfactoren zijn als in formule 2 en s1800, s3000, s6000 en s10000 de met formule 3 berekende standaardafwijkingen zijn.

Last Update: 2014-11-07
Usage Frequency: 1
Quality:

Reference: IATE

German

bei jeder geschwindigkeit werden spannung und ausgangsstromstärke konstant gehalten, bei einem 180 a-wechselstromgenerator beträgt die spannung 14,3 v und die stromstärke 90 a. für jede geschwindigkeit wird das drehmoment mithilfe des prüfstands (vgl. abb. 1) gemessen und der wirkungsgrad anhand der formel 2 berechnet.

Dutch

voor een alternator in de 180 a-klasse bijvoorbeeld is dit 14,3 v respectievelijk 90 a. bij elk toerental moet het koppel worden gemeten door middel van de testbank (zie figuur 1) en moet het rendement met formule 2 worden berekend.

Last Update: 2014-11-07
Usage Frequency: 1
Quality:

Reference: IATE

Get a better translation with
7,724,959,185 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK