Vous avez cherché: i have attached my resume for the job (Anglais - Tamoul)

Contributions humaines

Réalisées par des traducteurs professionnels, des entreprises, des pages web ou traductions disponibles gratuitement.

Ajouter une traduction

Anglais

Tamoul

Infos

Anglais

i have attached my resume for the job

Tamoul

i have

Dernière mise à jour : 2021-02-10
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

i have attached my resume for your reference

Tamoul

as we discussed find the below job details for your reference

Dernière mise à jour : 2022-06-17
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

i have attached my resume. go through and verified my resume

Tamoul

எனது விண்ணப்பத்தை இணைத்து, எனது விண்ணப்பத்தை சரிபார்த்துள்ளேன்

Dernière mise à jour : 2022-05-02
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

i have already sent my resume to your mail

Tamoul

i will sent your email address sir

Dernière mise à jour : 2020-11-06
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

i have sent you my resume on you email id

Tamoul

मैं आपको ईमेल आईडी पर आप मेरे फिर से शुरू भेज दिया है

Dernière mise à jour : 2016-05-06
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

i have not received my pension for the month feb

Tamoul

i have not received

Dernière mise à jour : 2022-03-02
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

and i have attached thee to myself.

Tamoul

இன்னும், "எனக்காகவே நான் உம்மைத் (தூதராகத்) தெரிந்தெடுத்துள்ளேன்.

Dernière mise à jour : 2014-07-03
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme
Avertissement : un formatage HTML invisible est présent

Anglais

i thought of asking you for the job

Tamoul

நான் உங்களிடம் கேட்க நினைத்தேன்

Dernière mise à jour : 2020-07-13
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

here i have attached invoice & packing list at rhodius samples for trails.

Tamoul

இங்கே நான் விலைப்பட்டியல் இணைத்துள்ளேன்

Dernière mise à jour : 2021-12-17
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme
Avertissement : un formatage HTML invisible est présent

Anglais

why didn't you apply for the job

Tamoul

நீங்கள் ஏன் இப்படி நடந்து கொண்டீர்கள்

Dernière mise à jour : 2020-10-01
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

i have travel start for the chennai airport.tomorrow morning lagos arrivel

Tamoul

நான் சென்னை விமான நிலையத்திற்கு பயணத் தொடக்கத்தைக் கொண்டுள்ளேன். நாளை காலை லாகோஸ் வருகிறார்

Dernière mise à jour : 2020-02-05
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

the above mentioned truck driver lost the original acknowledgement. herewith i have attached xerox copies of delivery chalan and eway bill for your verification, kindly pay the freight charges

Tamoul

மேலே குறிப்பிட்டுள்ள டிரக் டிரைவர் அங்கீகாரத்தை இழந்தார். உங்கள் சரிபார்ப்புக்காக டெலிவரி சலான் மற்றும் ஈவே பில் ஆகியவற்றின் ஜெராக்ஸ் பிரதிகளை இத்துடன் இணைத்துள்ளேன், சரக்குக் கட்டணத்தை தயவுசெய்து செலுத்தவும்

Dernière mise à jour : 2021-12-10
Fréquence d'utilisation : 2
Qualité :

Référence: Anonyme

Anglais

eda50 got absolute  a year back its equivalent  model  is mt 90.i have attached mt90 quotation and brochure for your reference.

Tamoul

உங்கள் உறுதிப்படுத்தலுக்கு நன்றி. இங்கே நான் உங்கள் குறிப்புக்கான மேற்கோளை இணைத்துள்ளேன், தயவுசெய்து சரிபார்த்து, உற்பத்தி நோக்கங்களுக்காக பணம் செலுத்துங்கள்

Dernière mise à jour : 2022-02-25
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

(he boasts and shows off) saying, "i have spent a great deal of money (for the cause of god)".

Tamoul

"ஏராளமான பொருளை நான் அழித்தேன்" என்று அவன் கூறுகிறான்.

Dernière mise à jour : 2014-07-03
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme
Avertissement : un formatage HTML invisible est présent

Anglais

i would like to inform you that i am resigning from my position as final inspector from the quality department due to some personal reason. thank you very much for the opportunities for professional and personal development that you have provided me. i have enjoyed working for the department and appreciate the support provided me during my work with the company.

Tamoul

சில தனிப்பட்ட காரணங்களால் தர உத்தரவாத துறையிலிருந்து வரி ஆய்வாளராக என் நிலைப்பாட்டில் இருந்து ராஜினாமா செய்கிறேன் என்று உங்களுக்கு தெரிவிக்க விரும்புகிறேன். நீங்கள் எனக்கு வழங்கிய தொழில் மற்றும் தனிப்பட்ட வளர்ச்சிக்கான வாய்ப்புகளுக்கு மிகவும் நன்றி. நான் துறையில் வேலை அனுபவித்து மற்றும் company.at என் வேலை போது எனக்கு வழங்கப்பட்ட ஆதரவு பாராட்டுகிறேன்

Dernière mise à jour : 2018-05-25
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

8. the builder shall complete the work in time and handover the possession of the competed building to be owner provided the owner shall make the payment of instalments in time as per schedule b. the builder should ensure that he completes the work in stages in time to claim the money from the bank for the smooth functioning of the job entrusted.

Tamoul

9. in-case of dispute, the builder and the owner will discuss to resolve without affecting the progress of the work and monetary loss of both in an amicable way.

Dernière mise à jour : 2022-03-04
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme

Anglais

said an 'ifrit, of the jinns: "i will bring it to thee before thou rise from thy council: indeed i have full strength for the purpose, and may be trusted."

Tamoul

ஜின்களில் (பலம் பொருந்திய ஓர்) இஃப்ரீத் கூறிற்று: நீங்கள் உங்கள் இடத்திலிருந்து எழுந்திருப்பதற்கு முன் அதை நான் உங்களிடம் கொண்டு வந்து விடுவேன்; நிச்சயமாக நான் அதற்கு சக்தியுள்ளவனாகவும், நம்பிக்கைக்கு உரியவனாகவும் இருக்கிறேன்."

Dernière mise à jour : 2014-07-03
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme
Avertissement : un formatage HTML invisible est présent

Anglais

(o muhammad!) do they say that he himself has forged this message? tell them: 'if i have forged this, the guilt of it will fall upon me, but i am not responsible for the crimes you are committing.

Tamoul

(நபியே! நீர் இதைக் கூறும் போது;) "இதனை இவர் இட்டுக் கட்டிச் சொல்கிறார்" என்று கூறுகிறார்களா? (அதற்கு) நீர் கூறும்; "நான் இதனை இட்டுக் கட்டிச் சொல்லியிருந்தால், என் மீதே என் குற்றம் சாரும்; நீங்கள் செய்யும் குற்றங்களிலிருந்து நான் நீங்கியவன் ஆவென்."

Dernière mise à jour : 2014-07-03
Fréquence d'utilisation : 1
Qualité :

Référence: Anonyme
Avertissement : un formatage HTML invisible est présent

Anglais

sample written program for industrial safety 1 industrial safety program the following safety policy is provided only as a guide to assist employers and employees in complying with the requirements of 29 cfr 1910 and 1926, as well as to provide other helpful information. it is not intended to supersede the requirements of the standards. an employer should review the standards for particular requirements which are applicable to their individual situation and make adjustments to this program that are specific to their company. an employer will need to add information relevant to their particular facility in order to develop an effective, comprehensive program. 2 industrial safety program for (company name) table of contents topic safety & health policy statement safety & health goals new employee orientation safety & training employee responsibilities accident investigation/reporting personal protective equipment safety rules safety committee emergency action plan safety discipline employee confirmation 3 safety & health policy statement xyz manufacturing company believes that no job or task is more important than worker health and safety. if a job represents a potential safety or health threat, every effort will be made to plan a safe way to complete the task in a safe manner. every procedure must be a safe procedure. shortcuts in safe procedures by management and all other associates will not be tolerated. if a worker observes any unsafe or unprotected exposure, which may pose a potential threat to their safety & health, he or she must inform management immediately. if a job can not be done safely…………..it will not be done. every employee is entitled to a safe and healthful place in which to work. _______________________ president 4 safety & health goals the following goals have been established for xyz manufacturing company: (1) provide workers with a safe work environment. (2) conduct routine/regular workplace inspections. (3) provide personal protective equipment. (4) develop and implement safe work procedures and rules. (5) provide on-going safety training (6) enforce safety rules and appropriate discipline. (7) provide on-going property conservation practices. 5 new employee orientation all new employees must attend our safety orientation session prior to starting work within their assigned area. this session will be conducted under the direction of the safety director and in coordination with human resources. upon completion of the safety orientation session, each new employee will be required to acknowledge that they have received, understand, and will abide by the xyz company safety program. all participants must sign a statement verifying that they have completed the session. this report will be filed in the employee’s personnel file. the following topics will be covered in the safety orientation session:  company history  safety program/policy & work rules  responsibilities  safety education/training  safety audit/inspections  accident reporting/investigation requirements  first aid & bloodborne pathogens  personal protective equipment  tool & equipment use  material handling  lockout-tagout  machine guarding  mvr requirements  hazard communication  emergency action  return-to-work & light duty assignments all new hires will be provided an opportunity to ask any question that pertains to their job duties and employment at xyz manufacturing company. 6 safety & training all in-house safety & training sessions will be coordinated by (name of safety director). foremen and assistant foremen are required to be trained in accident investigation procedures by the safety director. operators of forklift trucks are to be trained in-house in accordance with federal/state requirements. operators must attend classroom instruction as well as “behind the wheel training”. all employees who work with, or are exposed to, hazardous chemicals are to be trained in hazard communication, in accordance with federal and state regulations. all employees who don respirators are to be trained in accordance with federal and state regulations. those individuals who don respirators are required to have annual physicals. machine operators and maintenance personnel are to be trained in lockout/tagout procedures. individual locks/keys will be assigned to those individuals participating in the loto program. all employees who don personal protective equipment (ppe) will be trained in the proper use of such equipment. first-aid training and bloodborne pathogen (bbp) training will be conducted by (name of hospital) and the local chapter of the american red cross. machine/equipment operators are to be trained in-house. emphasis is to be placed on point of operation guarding. no employee is allowed to operate a machine unless it is properly guarded. employees who operate company vehicles are required to participate in an in-house defensive driving program. 7 all production, shipping, and warehouse employees are required to attend a 4 hour in-house safety training session on an annual basis. this partial day session is held each january in the conference room. the safety director will decide the topic material; however each annual session is to place emphasis on material handling and machine guarding. all employees, at time of hire, are to be trained in emergency action and proper evacuation of building in case of an emergency. each employee is to be given instruction/training on where to exit and where to locate in the event of an emergency. foremen and assistant foremen are to meet with the safety director on a quarterly basis to discuss training needs and goals. 8 employee responsibilities each employee is responsible to follow established polices and procedures. regular attendance is required of all. following directions is critical. responsibility does not end with just taking care of you. unsafe working conditions and acts must be reported to management. it is the responsibility of each employee to work in a professional and safe manner. 9 accident investigation/reporting all injuries/illnesses must be reported to management as soon as possible. it is the policy of xyz manufacturing company to have all injuries/illnesses investigated by foremen or assistant foremen within 24 hours of incident. a formal accident investigation form (available from the safety director) must be forwarded to the safety director as soon as possible. it is important that all incidents be reported, no matter how slight. any property/liability loss claim must also be reported to management as soon as possible. the safety director will conduct a loss investigation of all property/liability claims. 10 personal protective equipment personal protective equipment (ppe) includes all clothing and accessories designed to protect against workplace hazards. in some situations the only available protection for employees will be the use of ppe and often in emergencies, ppe will be required for the safety of the workers. as required by federal and state regulations, personal protective equipment is essential for the protection of eyes, ears, face and other body parts when working around hazardous machinery and equipment. all ppe must meet established standards (ansi, niosh, osha, etc). all personal protective equipment (ppe) is provided by xyz manufacturing company. employees are not allowed to provide their own ppe unless authorized by the safety director. as a general rule, only company provided ppe is allowed. hazard assessments have been completed throughout the production and warehouse areas of xyz manufacturing company. ppe is required in the following areas: warehouse all employees and visitors are required to wear approved hard hats and eye protection. steel-toed shoes/boots required of warehouse workers. welding shop all employees and visitors are required to wear approved eye protection. approved hard hats required of all welders. approved hearing protection required of all welders. welders are also required to don approved ppe in the form of goggles, helmet, leather coat, apron, steel-toed work boot, gloves, no cuff pants and other 11 equipment as deemed necessary by the safety director. mechanical ventilation is required at all welding stations. paint shop all employees and visitors are required to wear approved eye protection. spray painters are required to wear company provided work clothing (disposable shirt/pants). approved respirators are required during those times when spray painting, mixing, or clean-up is taking place. steel-toed boots/shoes required of paint sprayers. all spray painting is to be conducted within the paint spray booth. mechanical ventilation system is to be in operation when spray painting takes place. general production areas approved eye protection required of all who enter shop. visitor glasses (eye protection) are available in main office as well as next to loading dock door and warehouse entrance. xyz manufacturing company will reimburse employee (maximum - $100) each 24 months for the purchase of approved steel-toed boot/shoe. xyz manufacturing company will provide prescription eye wear (approved safety eye protection) for those individuals requesting same. see safety director for additional information. 12 safety rules all safety rules must be obeyed. failure to do so will result in strict disciplinary action.  all injuries must be reported as soon as possible.  no horseplay, alcohol, or drugs allowed on premises.  no alcohol usage allowed during lunch break.  ppe must be worn as prescribed by management.  all tools/equipment must be maintained in good condition.  only appropriate tools shall be used for specific jobs.  all guards must be kept in place.  no spliced electrical cords/wiring allowed.  only authorized personnel can operate forklift vehicles.  smoking allowed only in lunchroom.  seat belt use required of all drivers/passengers.  all osha safety standards will be followed for job processes requiring respiratory protection. *see separate written respiratory protection program.  all osha safety standards concerning lockout/tagout of energized equipment will be followed. *see separate written lockout/tagout program.  all osha safety standards concerning hazard communications will be followed. *see separate written hazard communications program. 13  all osha safety standards concerning forklift safety will be followed. *see separate written forklift safety program. *these sample written safety programs can be found on the frankenmuth safety services website. they can be downloaded as a pdf or microsoft word file. 14 safety committee the primary purpose of the safety committee is to promote safety awareness and reduce the potential for injury/loss throughout xyz manufacturing company. the safety committee is to be chaired by the safety director and include representatives from each department (total number of committee members not to exceed five individuals). members can be volunteers or appointed. membership is limited to two terms (1 year each) during any four year period. meetings are to be scheduled, when possible, for the same day each month (2nd tuesday of each month – 2:00 p.m.). all meetings are to take place in the conference room. each meeting should have a set agenda and minutes of each meeting recorded. a copy of the minutes shall be forwarded to the executive vice-president within 48 hours of meeting. each safety committee meeting shall include a review of the prior month’s minutes as well as a review of the prior month’s injury/illness log and investigations of losses/claims. past injuries/claims/losses need to be reviewed for any patterns or trends. general functions of the safety committee can include: (1) identifying workplace hazards (2) enforcement of safety rules (3) measuring safety performance (4) reducing frequency/severity of injuries (5) creating safety policies (6) developing and monitoring safety programs specific tasks of the safety committee can include: (1) conducting self-inspections of the workplace 15 (2) review employee reports of hazards (3) assist in safety training (4) creating safety incentive programs (5) publish/distribute safety newsletter (6) inspect ppe (7) post safety posters/slogans on bulletin board (8) identify light duty jobs the safety committee of xyz manufacturing company was formed to promote safety throughout our organization. the benefits of a safety committee are numerous and xyz manufacturing believes that this is a forum for problem solving. the safety committee has an open door policy and welcomes suggestions. 16 emergency action plan the emergency action plan (eap) is in place to ensure employee safety from fire and other emergency. at the time of an emergency, all employees should know what type of evacuation is necessary and what their role is in carrying out the plan. in some emergencies total and immediate evacuation will be necessary. in other emergencies only partial evacuation may be necessary. when a fire is detected it is necessary that the fire alarm pull station be activated as soon as possible. the fire alarm will notify the emergency response team who will perform assigned duties. the activation of the alarm will also notify the local fire department. in the event of bomb threat, toxic chemical release, hazardous weather, or other emergencies – notification will be made over the public address system. in the event of fire, bomb threat, or toxic chemical release; employees are to proceed to the nearest available and safe exit and leave the building as soon as possible. floor plans (maps) and exits have been posted in each department. it is of critical importance that all employees and visitors are accounted for. shop and warehouse employees are to meet in the __________ parking lot on _______ street. secondary location is the intersection of _________ and ________ street. office employees are to meet in the __________ parking lot on __________ street. secondary location is the intersection of __________ and __________ street. 17 in the event of weather emergencies all employees (and visitors) are to evacuate their assigned area and report to the lower level bomb shelter. again, it is of critical importance that all employees and visitors are accounted for. supervisors within each area shall take a head count at the designated meeting areas. it is the responsibility of each supervisor to advise fire and police departments of any missing persons. there will be evacuation training each april and october (full evacuation to designated areas). 18 safety discipline management personnel at all levels are responsible for taking action when a violation is observed. if a violation is observed, they must take action immediately to correct the violation and enforce this disciplinary policy. employees who fail to follow safety rules and regulations established to protect them and their fellow employees endanger themselves and others. visitors and contractors on site are also required to abide by the safety rules and regulations. the following procedures will be followed when a violation is observed: first violation* verbal warning with written confirmation in personnel file. second violation* written warning and ½ day suspension (written confirmation in personnel file). third violation* written warning and one week suspension (written confirmation in personnel file). fourth violation* termination (written confirmation in personnel file). 19 *as warranted by type of violation (use of drugs/alcohol, criminal activity, etc.) termination of employment may take place after any such violation. employee confirmation of safety program this is to certify that i, ___________________________________, have read and will observe the safety practices as outlined in this booklet and other rules presented to me during my employment with xyz manufacturing company. i understand that the safety practices listed are not the only procedures and/or rules that i will be called upon to follow. i also understand that it is a requirement of my employment that any injury/illness be reported to my supervisor immediately. signed _________________________________________ witness ________________________________________ date _______________________ this form to be filed in personnel file the information and suggestions contained in this material have been developed from sources believed to be reliable. however, frankenmuth accepts no legal responsibility for the correctness or completeness of this material, or its application to specific factual situations.

Tamoul

தமிழ் தொழில்துறை பாதுகாப்பு பற்றிய கட்டுரை

Dernière mise à jour : 2017-03-05
Fréquence d'utilisation : 31
Qualité :

Référence: Anonyme
Avertissement : un formatage HTML invisible est présent

Anglais

contract to build a house at i. contract parties now comes (builder’s name) of (address) and (buyer’s name) of (address) to hereby agree to build a house on property located at (common address) and legally described as (insert legal description here.) . ii. contract documents the terms of this contract include all the documents specifically listed below, and constitute the entire terms of the agreement between the parties. the terms of this contract shall prevail over any conflicting provision in the documents incorporated by reference. 1. architectural plans and drawings dated with number of pages is hereby incorporated into this document. 2. specifications dated with number of pages is hereby incorporated into this document. 3. schedule of allowance items dated with number of pages is hereby incorporated into this document. 4. title of document – add any documents not included in the previous samples, delete any of the previous samples no longer needed dated with number of pages is hereby incorporated into this document. iii. building plans first option: use when the plans are supplied by the buyers the builder agrees to construct the home in accordance with the plans, including specifications and drawings, supplied by the buyer and incorporated by reference into paragraph ii. contract documents. the builder assumes no responsibility or liability for defects in the design or engineering in these plans. the buyer represents to the builder that the buyer is the sole owner of the plans or has the legal right to use the plans. the buyer agrees to indemnify and hold the builder harmless for any copyright action which may be asserted as a result of the use of the plans. the buyer warrants that the plans are adequate and that the builder can rely on them. the buyer will be liable for any damages caused by defects in the plans, including, but not limited to, additional material costs, additional labor costs, pro rata overhead and profit. second option: use when the plans are supplied by the builder the builder has provided the plans, specifications and drawings which are incorporated by reference into paragraph ii. contract documents, and which are to be used for the construction of the house. the builder makes no representation about the quality of these plans beyond those specifically provided in the warranties clause of this contract. iv. completion time assuming all conditions are satisfied and weather permits, the work to be performed under the contract shall be substantially completed no later than days after the work commences. the work shall commence within days after the permits necessary to start work have been issued, the buyer has supplied the builder with a written notice of financing as described in paragraph v. financing, and the buyer shall have supplied the builder with a correct statement of the recorded legal title of the property and the buyer’s interest in the property. any time lost by reason of changes to the contract or changes in plans by the buyer, other acts of the buyer, strikes, weather conditions not reasonably anticipated, or any other condition not within the builder’s control shall be added to the specified time for completion. for any delays which are not the builder’s responsibility, the contract price shall increase by any increase in the builder’s costs caused by the delay. a claim for an increase in time for the performance of the contract, or an increase in the contract cost shall be made within days after the builder first recognizes the condition giving rise to the claim. v. financing this contract is contingent upon the buyer obtaining a construction loan in the amount of $ dollars. all fees and expenses of obtaining a loan shall be borne by the buyer. the builder is not required to begin construction until the buyer provides the builder with written notice from the lender confirming the loan. vi. contract price first option: fixed price contract the buyer agrees to pay a total price of $ dollars to the builder for construction of the house, and the builder agrees to provide all the labor, materials, equipment, tools, and other services necessary to construct the house. upon the signing of this contract, the buyer agrees to pay $ dollars to the builder as a deposit. the buyer will make the following interim payments: (list the amounts and number of the progress payments and what triggers them: for example, specific dates such as the first monday of every month; or the start or the completion of specific construction events.) the buyer agrees to make a final payment in the amount of $ within days of the buyer’s final inspection and acceptance of the property (alternative language, such as: “within days after substantial completion”). the buyer is not entitled to possession until after final payment. second option: cost plus fee the builder agrees to construct the house according to the plans. as consideration for the builder constructing the house, the buyer agrees to pay the builder’s full costs and expenses, plus a fixed fee of $ dollars. upon signing the documents, the buyer will pay $ dollars as a deposit. each (at the end of the week or month) the builder shall prepare for the buyer itemized statements of the costs and expenses incurred to date. the buyer will make a regular payment to the builder on (a regular recurring date such as the first monday of each week) of the builder’s unpaid costs and expenses as stated in the most recent itemized statement. the builder’s costs and expenses include the following: all gross wages, employment benefits, costs of workers’ compensation, and unemployment insurance incurred by the builder as the cost of labor during the performance of this contract, plus all salaries for builder’s employees, but only to the extent that their time is spent on work required by this contract; the cost of all materials, supplies, and equipment consumed in this project, including the cost of delivery and transportation of materials; rental charges consistent with those prevailing in the area for the use of machinery and equipment used at the construction site, whether owned by the builder or by others; all land costs associated with building this house, which are paid by the builder; all payments made by the builder for work performed according to subcontracts under this agreement; all costs incurred for safety and security at the job site; all costs incurred for building and code compliance; all landscaping and backfilling costs necessary under the contract documents; all builder’s risk and other insurance costs necessary under the contract documents; all soil fees and civil engineering fees necessary for this building project; all costs associated with differing site conditions. a differing site condition is a physical characteristic of the property that materially changes the construction techniques from those reasonably expected at the time of the contract. the buyer shall also pay to the builder a salary or hourly rate of $ for the builder’s actual hours spent on supervision of the construction of this house. the buyer will make a final payment of all amounts still owing within days of the buyer’s final inspection and acceptance of the property (alternative language, such as: “within days after substantial completion”). the buyer is not entitled to possession until after final payment. vii. allowance items upon signing this contract, the buyer shall be given the selection guide that is incorporated by reference into paragraph ii. contract documents to help the buyer select allowance items, materials, and colors that will be required during the construction process. exterior selections must be made within days of signing this contract. interior selections must be made within days of signing this contract. viii. late payments payments not made in a timely fashion shall incur daily interest at the rate of % from the day the payment is due. if the buyer fails to pay the builder within seven days of the date the payment is due, through no fault of the builder, the builder may stop work and may keep the job idle until such time as payments that are due to the builder are paid. if the builder chooses not to stop work after a payment delay, this is not to be construed as a waiver of his rights to stop work if future payments are delayed. all attorney fees incurred by the builder to collect sums owed by the buyer shall be paid by the buyer, together with interest at the rate of %. ix. permits and surveys the buyer shall obtain and furnish all necessary surveys describing the physical characteristics of the property, the location of all utilities, and the location of all easements to the building that are necessary to allow the builder to complete his performance. if additional easements are necessary to complete the work, the buyer shall obtain those easements promptly. if no soil report is available, the buyer shall provide one at his own expense. the builder shall obtain building permits, licenses, building inspections and approvals required by local law. if a covenant or architectural review committee requires the approval of plans and specifications, the buyer shall be responsible for obtaining these approvals and paying for any fees connected with them. x. change orders the buyer may order changes in the work within the terms of this contract, but only by a prior written order and agreement with the builder that states the changes to the contract, the amount of any additional cost, and the additional number of days to be added to the contract completion date. any of the buyers may sign the change order and that signature will be binding upon all of the buyers. the buyers hereby agree to make all requests for change orders to the builder, and not to issue instructions to, or otherwise negotiate for additional or changed work specifications with, the builder’s employees or subcontractors. xi. insurance and risk management the builder shall obtain all workers’ compensation, commercial general liability insurance and comprehensive liability insurance necessary to protect builder from claims for damages due to bodily injury, including death, and for damages to property that may arise out of and during operations under this contract. the buyer shall purchase his own liability insurance including fire and casualty insurance to the full insurable value of the house and shall name the builder as an additional insured. each party shall issue a certificate of insurance to the other prior to the commencement of construction. xii. access to the property site the buyer shall have access to the property and the right to inspect the work in the presence of the builder. if the buyer enters the property during the course of construction without the permission of the builder, he does so at his own risk, and the buyer hereby releases the builder and does hereby hold the builder harmless from any and all claims for injury or damage to his person or property, and to the person or property of any person accompanying the buyer. xiii. inspection, acceptance, final payment and possession at the final inspection, the buyer will give the builder a signed and dated list that identifies any alleged deficiencies in the quality of the work or materials. the builder shall correct any items on the buyer’s list that are, in the good faith judgment of the builder, deficient in the quality of the work and/or materials according to the standards of construction in the area in which the house is built. the builder shall correct those defects within a reasonable period of time. after the defects have been corrected according to the standards of construction in the area in which the house is built, the buyer shall sign a certificate of acceptance acknowledging that the defects on the buyer's list have been corrected according to the standards of this contract. the builder shall provide the buyer with an affidavit stating that all materials and services for which a lien could be filed have been paid, or an affidavit identifying what services and materials for which a lien could be filed have not been paid, and swearing that such amounts will be paid from the proceeds of the final payment. (some states give the property owners the right to withhold amounts for unpaid potential lienholders, and make those payments directly to those potential lienholders.) occupancy will be granted to the buyer when the buyer makes a final inspection of the home, signs a certificate of acceptance, and makes the final payment. xiv. warranties all warranties are limited to the implied warranties of habitability and workmanlike construction and are limited to a period of one year from the date of the issuance of a certificate of occupancy by the local building code enforcement authority. this limited warranty is the only express warranty provided by the builder. xv. disputes should any dispute arise relative to the performance of this contract that the parties cannot resolve, the dispute shall be referred to a single arbitrator acceptable to the builder and the buyer. if the builder and the buyer cannot agree upon an arbitrator, the dispute shall be referred to the american arbitration association for resolution. all attorney fees that shall be incurred in the resolution of disputes shall be the responsibility of the party not prevailing in the dispute. xvi. the governing law and assignment this contract will be construed, interpreted, and applied according to the law of the state where the property is located. this contract shall not be assigned without the written consent of all parties. xvii. effective date and signature this contract shall become effective on the date it is signed by both parties. we, the undersigned, have read, understood, and agree to each of the provisions of this contract and hereby acknowledge receipt of a copy of this contract. by: (builder’s name) on behalf of (builder’s company name) title: date: by: (buyer) date: by: (buyer) date: attached contract documents: final contract 1. plans and specifications 2. allowance schedule (describe and include any other documents that have been incorporated by reference into the contract.)

Tamoul

கட்டிட ஒப்பந்த உடன்பாடு

Dernière mise à jour : 2015-11-08
Fréquence d'utilisation : 8
Qualité :

Référence: Anonyme

Obtenez une traduction de meilleure qualité grâce aux
4,401,923,520 contributions humaines

Les utilisateurs demandent maintenant de l'aide :



Nous utilisons des cookies pour améliorer votre expérience utilisateur sur notre site. En poursuivant votre navigation, vous déclarez accepter leur utilisation. En savoir plus. OK