プロの翻訳者、企業、ウェブページから自由に利用できる翻訳レポジトリまで。
første parameter i en funktionskonstruktion skal være navnetif it is a vector but the wrong size. we work in r2 here
první parametr v konstrukci funkce by měl být názevif it is a vector but the wrong size. we work in r2 here
最終更新: 2011-10-23
使用頻度: 1
品質:
according to the uk authorities, when applying the "r&e" method to bt, economic modelling was used to estimate the prospects of changes to the level of receipts over a period of five years, and an "equated" level of receipts and expenditure was estimated as being representative of the five year period.
according to the uk authorities, when applying the "r&e" method to bt, economic modelling was used to estimate the prospects of changes to the level of receipts over a period of five years, and an "equated" level of receipts and expenditure was estimated as being representative of the five year period.
最終更新: 2014-10-23
使用頻度: 1
品質:
警告:見えない HTML フォーマットが含まれています
関係性の低い人による翻訳は非表示になります。
関係性の低い結果を表示します。