プロの翻訳者、企業、ウェブページから自由に利用できる翻訳レポジトリまで。
pencawang
substation
最終更新: 2024-05-28
使用頻度: 1
品質:
参照:
pencawang masuk utama tnb
pencawang masuk utama
最終更新: 2019-07-08
使用頻度: 1
品質:
参照:
plan hitung pencawang elektrik tnb
tnb electric substation
最終更新: 2022-08-19
使用頻度: 1
品質:
参照:
rentis tnb
main switch station
最終更新: 2021-12-21
使用頻度: 1
品質:
参照:
tapak pencawang telekomunikasi
substation telecommunications
最終更新: 2016-11-18
使用頻度: 1
品質:
参照:
visi dan misi tnb
vision and mission tnb
最終更新: 2016-01-12
使用頻度: 1
品質:
参照:
gangguan tnb supply
gangguan bekalan elektrik
最終更新: 2020-10-26
使用頻度: 1
品質:
参照:
pengurusan dan pengurusan tnb
“to be among the leading corporations in energy and related businesses globally”
最終更新: 2015-11-18
使用頻度: 1
品質:
参照:
contoh surat wakil tnb
representative sample letter
最終更新: 2023-10-10
使用頻度: 2
品質:
参照:
sukacitanya dimaklumkan bahawa pihak tnb
we are pleased to inform you that
最終更新: 2024-03-29
使用頻度: 1
品質:
参照:
tnb rangkul anugerah platinum global csr summit
tnb wins csr summit global platinum awards
最終更新: 2021-11-24
使用頻度: 1
品質:
参照:
lapor diri untuk latihan industri di tnb kuala berang
report yourself on duty
最終更新: 2020-02-26
使用頻度: 1
品質:
参照:
pihak tnb telah menyatakan bahawa bekalan elektrik mencukupi sehingga 110a
citcat translation
最終更新: 2022-04-06
使用頻度: 1
品質:
参照:
untuk bulan jan2021 terdapat 3 kali bekalan kuasa tnb mengalami gangguan
for jan2021 there are 3 times tnb power supply experiencing disorders
最終更新: 2021-02-04
使用頻度: 1
品質:
参照:
membuat tuntutan kerana telah menerima memorandum bahawa she akan diberhentikan kerja di syarikat tnb
the court considered the constitutionality of deciding that mrs. rozanah had been removed from work on fair grounds and for legitimate reasons. thus the court rejected the claim of mrs. rozanah
最終更新: 2022-12-04
使用頻度: 1
品質:
参照:
tnb akan menjadi salah sebuah syarikat utama di malaysia yang menyumbang kepada pendapatan dan ekonomi negara dalam bidang pembinaan
tnb will be one of the leading companies in malaysia that contributes to the country's income and economy in the field of construction
最終更新: 2021-11-26
使用頻度: 1
品質:
参照:
rujukan kami: tnb grid / gm / kl 14/13/1
our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________
最終更新: 2018-04-03
使用頻度: 1
品質:
参照:
警告:見えない HTML フォーマットが含まれています