人が翻訳した例文から、翻訳方法を学びます。
プロの翻訳者、企業、ウェブページから自由に利用できる翻訳レポジトリまで。
review of your posting
review of your posting
最終更新: 2021-02-25
使用頻度: 1
品質:
参照:
book review of oliver twist
boekresensie van oliver twist
最終更新: 2022-08-14
使用頻度: 1
品質:
参照:
four types of method of pizza
4 maniere van pizza
最終更新: 2023-05-12
使用頻度: 1
品質:
参照:
method statement
method
最終更新: 2022-03-03
使用頻度: 1
品質:
参照:
a book review of a legende in afrikaans
what is the die name of the stroy
最終更新: 2023-09-19
使用頻度: 1
品質:
参照:
review of the movie fast and the furious 8
review of the movie fast and the furious 8
最終更新: 2020-09-22
使用頻度: 1
品質:
参照:
(8) review of pro-competitive conditions:
(8) hersiening van pro-mededingingsvoorwaardes:
最終更新: 2011-10-24
使用頻度: 1
品質:
参照:
a short book review of the legend of king midas
'n kort boekresensie van die legende van koning midas
最終更新: 2024-02-05
使用頻度: 1
品質:
参照:
such consideration and review of the amended agreement by the authority.
die owerheid.
最終更新: 2011-10-24
使用頻度: 1
品質:
参照:
(a) where the authority undertakes a review of the pro-competitive conditions
(a) waar die owerheid ân hersiening onderneem van pro-mededingingsvoorwaardes
最終更新: 2011-10-24
使用頻度: 1
品質:
参照:
c/. based on the sources from literature review of 50 journal articles selected that found three element to develop gps model namely, green practices as independent variables consists eleventh (11) practices such as remanufacturing, eco design, process design, lean practices, cleaner production, product design, corporate social responsibility, product returns, product recovery, green purchasing and reverse logistics. sustainability in supply chain as the mediating/intervening consists three (3)
c /. berdasarkan sumber kajian literatur dari 50 artikel jurnal yang dipilih, tiga elemen untuk membangunkan model gps iaitu praktik hijau sebagai pembolehubah bebas terdiri dari 11 (11) amalan seperti remanufaktur, reka bentuk eko, reka bentuk proses, amalan ramping, pengeluaran bersih, produk reka bentuk, tanggungjawab sosial korporat, pulangan produk, pemulihan produk, pembelian hijau dan logistik terbalik. kemampanan dalam rantaian bekalan sebagai pengantaraan / campur tangan terdiri daripada tiga (3)
最終更新: 2019-09-25
使用頻度: 1
品質:
参照: