전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.
semakan pelan bangunan
receive comments and terms adjustments
마지막 업데이트: 2022-02-26
사용 빈도: 1
품질:
추천인:
permohonan kelulusan pelan bangunan
building plan approval application
마지막 업데이트: 2020-04-08
사용 빈도: 1
품질:
추천인:
senarai semak permohonan kelulusan pelan bangunan
building plan approval application form
마지막 업데이트: 2022-04-19
사용 빈도: 1
품질:
추천인:
mematuhi semua syarat perintah pembangunan yang berkaitan dengan kelulusan pelan bangunan
comply with all the requirements of the developmental order relating to building plan approvals
마지막 업데이트: 2018-11-22
사용 빈도: 1
품질:
추천인:
bina lukisan teknikal seperti pelan bangunan, hiasan dalaman atau komponen mekanikal.
create technical drawings such as building plans, interiors or mechanical parts.
마지막 업데이트: 2014-08-15
사용 빈도: 1
품질:
추천인:
mematuhi dan menyediakan pelan bangunan keperluan keperluan kebombaan berikut sebelum kelulusan pelan bangunan:
adhere to and prepare building plans the following required fire requirements prior to building plan approvals:
마지막 업데이트: 2018-11-23
사용 빈도: 1
품질:
추천인:
mematuhi dan menyediakan pelan bangunan menurut kehendak kehendak garispanduan tempat letak kereta jabatan perancangan insfrastruktur 2013 sebelum kelulusan pelan bangunan
adhere to and prepare building plans in accordance with the requirements of the parking guidelines on the planning of the infrastructure planning 2013 prior to building plan approval
마지막 업데이트: 2018-11-23
사용 빈도: 1
품질:
추천인:
seterusnya, untuk dinding pula adalah menggunakan warna cerah atau putih. ini kerana warna ini memantulkan haba lebih baik daripada warna gelap. semasa proses rekabentuk, sebaiknya pelan bangunan ini direka memanjang timur ke barat agar dinding yang terdedah kepada matahari naik dan turun adalah kecil.
next, for the walls, it is necessary to use bright colors or white. this is because this color reflects heat better than the dark color. during the design process, it is recommended that the building plan be designed to extend east to west so that the walls exposed to the rising and falling sun are small.
마지막 업데이트: 2022-06-19
사용 빈도: 1
품질:
추천인:
3.2 mematuhi keperluan / kehendak uukb (wpkl) 1985 dan garispanduan jrbb sebelum kelulusan pelan bangunan iaitu : a. perlu menjelaskan tambahan fee memproses pelan bangunan sebanyak rm25,078.00
3.2 requirements/needs of the uukb (wpkl) 1985 and guidelines jrbb before building plan approvals which are: a. the need to clarify further processing fee of rm25, 078.00 building
마지막 업데이트: 2018-11-22
사용 빈도: 1
품질:
추천인:
menjalankan semua aktiviti yang berkaitan dengan penilaian pelbagai harta tanah termasuk mengambil perbandingan, membuat lawatan dan pemeriksaan harta tanah, menyemak butir butir hak milik dan perancangan, menyelidik maklumat dan menganalisis data, menyediakan pelan pelan bangunan, lokasi, perbandingan dan aktiviti lain yang perlu, menyediakan laporan nilaian yang berkualiti dan melaporkan nilaian dalam had kuasa yang diberi.
performs all activities related to the assessment of various properties including comparing, performing property inspections and inspections, reviewing property and planning details, researching information and analyzing data, preparing building plans, locations, comparisons and other necessary activities, providing report quality reports and report values within a given power limit.
마지막 업데이트: 2019-11-14
사용 빈도: 1
품질:
추천인: