전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.
at 8
baiki lantai retak dan sapu epoxy coating
마지막 업데이트: 2021-09-10
사용 빈도: 1
품질:
추천인:
i wake up at 8 am
contoh karangan rutin harian saya di sekolah
마지막 업데이트: 2020-12-18
사용 빈도: 1
품질:
추천인:
they left home at 8:00 am
mereka dijemput
마지막 업데이트: 2020-03-02
사용 빈도: 1
품질:
추천인:
we depart from home at 8:00 am
berpeluang
마지막 업데이트: 2019-09-09
사용 빈도: 1
품질:
추천인:
back to work at 8 o'clock
masuk kerja pukul 8
마지막 업데이트: 2022-06-15
사용 빈도: 1
품질:
추천인:
we left from the house at 8:00 am
kami bertolak dari rumah pada pukul 8:00 pagi
마지막 업데이트: 2022-07-17
사용 빈도: 1
품질:
추천인:
meet me near the market at 8 p.m.
saya dekat pasar
마지막 업데이트: 2024-02-11
사용 빈도: 1
품질:
추천인:
the camping is held on saturday 20ogos2022 at 8 am.
camping ini diadakan pada hari sabtu 20ogos2022 pada pukul 8 pagi
마지막 업데이트: 2022-08-10
사용 빈도: 1
품질:
추천인:
good evening mr. report at 8 later send to me yes thank you mpcc
selamat petang encik, laporan jam 8 nanti hantar pada saya ya terima kasih mpcc
마지막 업데이트: 2020-09-03
사용 빈도: 1
품질:
추천인:
first of all we plan to gather with our team at utc, kuantan pahang at 8 pm
mula mula kami bercadang untuk berkumpul dengan pasukan kami di utc, kuantan pahang pada pukul 8 pm
마지막 업데이트: 2021-11-29
사용 빈도: 2
품질:
추천인:
at 8 am, i reported to tun dr ismail's library as a practical student
pada pukul 8 pagi, saya melapor diri di perpustakaan tun dr ismail sebagai pelajar latihan industri
마지막 업데이트: 2021-09-27
사용 빈도: 1
품질:
추천인:
last week, my family and i had planned to go to redang island. we arrived at the payang coastal jetty at 8 am. upon arrival, we boarded a boat to reach redang island
pada minggu lepas, saya dan kaluarga telah merancang untuk pergi ke pulau redang. kami telah sampai di jeti pesisir payang pada pukul 8 pagi. setelah sampai, kami menaiki bot untuk sampai ke pulau redang
마지막 업데이트: 2020-09-02
사용 빈도: 1
품질:
추천인:
the table above shows the working days of zf multi smart engineering sdn bhd are monday to saturday. working hours start at 8:30 am and end work at 5:30 pm. next, sunday is a public holiday. in addition, the zf company also provides a special holiday which is the third week holiday on saturdays every month.
jadual di atas menunjukkan hari bekerja syarikat tmj adalah isnin hingga sabtu. waktu bekerja bermula jam 9 pagi dan tamat kerja pada jam 6 petang. manakala pada hari sabtu adalah setengah hari dari jam 9 pagi hingga 1 petang sahaja. seterusnya, ahad adalah cuti umum.
마지막 업데이트: 2021-11-24
사용 빈도: 1
품질:
추천인:
on 10/6/2020 at around 8:30 pm, when soil nailing team start grouting at second point. hoo boon loong (site co ordinator) try to open grouting mixer for grouting work.unexpected, grouting hose was taken off from cement mixer due to lack of water. cement was exposed and got hit the eye.
pada 10/6/2020 pada sekitar 8:30 malam, ketika pasukan pemanasan darat mulai bergerak di point kedua. hoo boon loong (site co ordinator) cuba untuk membuka grouting mixer untuk grouting kerja. tidak diharapkan, grouting hose telah dihapuskan daripada cement mixer kerana kurang air. semen dipakai dan memiliki mata.
마지막 업데이트: 2020-06-15
사용 빈도: 1
품질:
추천인: