전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.
3.0 monitoring and evaluation plan 3.1 performance measurement planthere are no requirements for ongoing performance measurement or evaluation of forest fire suppression activities after the devolution date.
3.0 plan de surveillance et d’évaluation 3.1 plan de mesure du rendementil ne sera pas nécessaire d’assurer en permanence la mesure du rendement ou l’évaluation des activités d’extinction des incendies de forêt après la date du transfert des responsabilités.
마지막 업데이트: 2015-05-14
사용 빈도: 1
품질:
ately 1.4 approxim our planthere are f water on ometres o r (oceans, cubic kil rface wate ored as: su water in et, it is st , glacier); kes, snow underrivers, la nd water osphere; a rtunately, the atm ater). unfo (groundw navailable ground water is u all of the e world’s almost oses.
tres de kilomè ,4 milliard cette environ 1 . il y a tre planète au sur no cubes d’e s eaux de s le ockée dan lacs, eau est st s, fleuves, ns, rivière e (océa sphère et surfac ans l’atmo laciers), d ines). neige et g x souterra té le sol (eau sque totali dans ent, la pre eureusem malh ropre à la si, au est imp ssible.
마지막 업데이트: 2015-05-14
사용 빈도: 1
품질: