전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.
schedule b ussor 10 (execution of works involved in the work covered by various chapter of sec railway ,unified standard schedule of rates (works and material)2010 of engineering department and indian railways unified standard specifications (works and materials) volume i and ii 2010 and up to date correction slip) 1640000.00 above/ below/par 1 lump sum 1640000.00
schedule b ussor 10 (execution of works involved in the work covered by various chapters of sec railway, unified standard schedule of rates (works and material) 2010 of engineering department and indian railways unified standard specifications (works and materials) volume i and ii 2010 and up to date correction slip) 1640000.00 above / below / par 1 lump sum 1640000.00
마지막 업데이트: 2020-07-08
사용 빈도: 1
품질:
추천인: