Tentando aprender a traduzir a partir dos exemplos de tradução humana.
De: Tradução automática
Sugerir uma tradução melhor
Qualidade:
A partir de tradutores profissionais, empresas, páginas da web e repositórios de traduções disponíveis gratuitamente
the project is empty
ပရာဂျက်ကအလွတ်ဖြစ်နေသည်
Última atualização: 2014-08-20
Frequência de uso: 2
Qualidade:
add files to the project
ဖိုင်ထည့်
Última atualização: 2014-08-20
Frequência de uso: 2
Qualidade:
the project started with the...
ထိုစီမံကိန်း စတင်ခဲ့ပုံမှာ
Última atualização: 2016-02-24
Frequência de uso: 1
Qualidade:
error while loading the project
ပရောဂျက်အားဖွင့်နေစဉ်အမှားဖြစ်သည်
Última atualização: 2014-08-20
Frequência de uso: 2
Qualidade:
please add files to the project.
ပရောဂျက်သို့ဖိုင်များကိုထည့်ပါ
Última atualização: 2014-08-20
Frequência de uso: 2
Qualidade:
the project "%s" does not exist
"%s"ကိုမတွေ့တော့ဘူး
Última atualização: 2014-08-20
Frequência de uso: 2
Qualidade:
Aviso: contém formatação HTML invisível
remove the selected files from the project
ရွေးချယ်သည့်ဖိုင်ကို ပရေၐျက်မှဖယ်ထုတ်ပါ
Última atualização: 2014-08-20
Frequência de uso: 2
Qualidade:
_tip of the day
တနေ့တာ သိကောင်းစရာ
Última atualização: 2014-08-20
Frequência de uso: 1
Qualidade:
the dictionary of the bath
dictionaryဗာမာစာ ဗာမာစာ
Última atualização: 2018-03-16
Frequência de uso: 1
Qualidade:
Referência:
the height of the window
window ၏အမြင့်
Última atualização: 2014-08-15
Frequência de uso: 1
Qualidade:
Referência:
prince of the house woke up
ဗိသႏုိးမင္းသား
Última atualização: 2018-07-11
Frequência de uso: 1
Qualidade:
Referência:
diagnosis of any of the following:
ဖော်ပြပါတစ်စုံတစ်ရာ၏ ရောဂါစမ်းသပ်စစ်ဆေးမှု-
Última atualização: 2020-08-25
Frequência de uso: 1
Qualidade:
Referência:
however, the mayor has yet to provide any details about the start or the financial cost of the project.
ဒါပေမဲ့ မြို့တော်ဝန်က ဘယ်တော့စလုပ်မယ်ဆိုတာနဲ့ ဘဏ္ဍာရေး ကုန်ကျစရိတ်အသေးစိတ်ကို မပေးသေးပါဘူး။
Última atualização: 2016-02-24
Frequência de uso: 1
Qualidade:
Referência:
as a potential combination therapy, they are used together in two phase iii arms of the 2020 global solidarity project on covid-19.
ဖြစ်နိုင်ချေရှိသော ပေါင်းစပ်ကုထုံးအဖြစ်၊ 2020 ကမ္ဘာလုံးဆိုင်ရာ ပေါင်းစည်းရေးပရောဂျက်၏ အဆင့် iii အခွဲနှစ်ခုကို covid-19 တွင် အတူတကွအသုံးပြုထားပါသည်။
Última atualização: 2020-08-25
Frequência de uso: 1
Qualidade:
Referência:
at a ceremony called "cloghers corner" held in november 2014, the three winners and all participants of the project were recognized.
နို၀င်ဘာ ၂၀၁၄ က ကျင်းပခဲ့သော "cloghers corner" ဟု ခေါင်းစဉ်တပ်ကျင်းပခဲ့သည့် အခမ်းအနားတစ်ခုတွင် အနိုင်ရရှိသူသုံးဦးနှင့် စီမံချက်တွင်ပါ၀င်သူ အမျိုးသမီးဘလော့ဂါများ အားလုံးတို့ကို အသိအမှတ်ပြု ခဲ့သည်။
Última atualização: 2016-02-24
Frequência de uso: 1
Qualidade:
Referência:
Aviso: contém formatação HTML invisível
path of the adium theme to use if the theme used for chat is adium.
အကယ်၍ သုံးထားသော သွင်ပြင်သည် adium ဖြစ်လျှင် adium သွင်ပြင်သုံးရန် လမ်းကြောင်း
Última atualização: 2014-08-20
Frequência de uso: 1
Qualidade:
Referência:
enter not into the path of the wicked, and go not in the way of evil men.
အဓမ္မလူတို့ လမ်းထဲသို့မဝင်နှင့်။ ဆိုးယုတ် သောသူတို့နှင့်အတူ မလိုက်နှင့်။
Última atualização: 2012-05-04
Frequência de uso: 1
Qualidade:
Referência:
path of the adium theme to use if the theme used for chat is adium. deprecated.
အကယ်၍ သုံးထားသော သွင်ပြင်သည် adium ဖြစ်လျှင် adium သွင်ပြင်သုံးရန် လမ်းကြောင်း
Última atualização: 2014-08-20
Frequência de uso: 1
Qualidade:
Referência:
the project called "empowering cloghers" recently wrapped up its first phase after receiving a rising voices microgrant in 2014.
"ကလော့ဟား" ဟူသော ဝေါဟာရသည် ကမ္ဘောဒီးယား ဘာသာစကားဖြင့် အမျိုးသမီး ဘလော့ဂါဟု အဓိပ္ပါယ်ရသည်။
Última atualização: 2016-02-24
Frequência de uso: 1
Qualidade:
Referência:
Aviso: contém formatação HTML invisível
as part of the abc open project "mother tongue" in which local communities partner with video producers from the australia broadcasting corporation to create participatory videos focusing on aboriginal language revitalization.
abc open ၏ "mother tongue (မိခင်ဘာစကား)"ဟုခေါ်သော စီမံကိန်း၏ အစိတ်အပိုင်းတစ်ခုအနေနှင့် ဒေသခံ ရပ်ရွာများသည် အေဘီစီ ခေါ် သြတစတြေးလျ ရုပ်သံလွင့် ဌာန (australia broadcasting corporation) မှ ဗီဒီယို ထုတ်လုပ်သူများနှင့်ပေါင်း၍ ကနဦး တိုင်းရင်းသား ဘာသာစကားများ ပြန်လည်အသက်သွင်းခြင်းကို အချက်အချာထားသည့် ဗီဒီယိုများကို ဖန်တီးရန် ပူးပေါင်းခဲ့ကြသည်။
Última atualização: 2016-02-24
Frequência de uso: 1
Qualidade:
Referência:
Aviso: contém formatação HTML invisível