Обучается переводу с помощью примеров, переведенных людьми.
От: Машинный перевод
Предложите лучший перевод
Качество:
Добавлены профессиональными переводчиками и компаниями и на основе веб-страниц и открытых баз переводов.
the method for liquid management for any waste landfill require strategy for the collection of leachate at the base of the waste aggregate which include a system that comprise of perforated pipes, drainage and filter materials such as gravel soils, sandy soils or geotextiles.
kaedah pengurusan cecair untuk mana-mana tapak pelupusan sampah memerlukan strategi pengumpulan larut resapan di dasar agregat buangan yang merangkumi sistem yang terdiri daripada paip berlubang, saliran dan bahan penapis seperti tanah kerikil, tanah berpasir atau geotekstil.
Последнее обновление: 2019-12-05
Частота использования: 1
Качество:
Источник:
then the pangs of childbirth brought her to the base of the palm-tree; she said, “oh, if only had i died before this and had become forgotten, unremembered.”
(ketika ia hendak bersalin) maka sakit beranak itu memaksanya (pergi bersandar) ke pangkal sebatang pohon tamar (kurma); ia berkata alangkah baiknya kalau aku mati sebelum ini dan menjadilah aku sesuatu yang dilupakan orang dan tidak dikenang-kenang!
Последнее обновление: 2014-07-03
Частота использования: 1
Качество:
Источник:
a reinforced concrete slab or block which interconnects a group of piles and acts as a medium to transmit the load from wall or column to the piles is called a pile cap. the pile cap should normally be rigid so as to distribute the forces equally on the piles of a group. in general it is designed like a footing on soil but with the difference that instead of uniform reaction from the soil, the reactions in this case are concentrated either point loads or distributed. as per is 2911 (part i/ sec 3) -2010, the pile cap may be designed by assuming that the load from column is dispersed at 45˚ from the top of the cap up to the mid depth of the pile cap from the base of the column or pedestal. the reaction from piles may also be taken to be distributed at 45˚ from the edge of the pile, up to the mid depth of the pile cap. on this basis the maximum bending moment and shear forces should be worked out at critical sections.
tetopi cerucuk
Последнее обновление: 2018-02-23
Частота использования: 3
Качество:
Источник:
Несколько пользовательских переводов с низким соответствием были скрыты.
Показать результаты с низким соответствием.