Att försöka lära sig översätta från mänskliga översättningsexempel.
Från professionella översättare, företag, webbsidor och fritt tillgängliga översättningsdatabaser.
survey cost
survey cost
Senast uppdaterad: 2020-03-14
Användningsfrekvens: 1
Kvalitet:
Referens:
. challenges in guiding children’s behaviour
challenges in guiding children’s behaviour
Senast uppdaterad: 2013-07-22
Användningsfrekvens: 1
Kvalitet:
Referens:
cost of goods sale
Senast uppdaterad: 2021-05-02
Användningsfrekvens: 1
Kvalitet:
Referens:
leaving cost zaman sekarang
the salary and benefits distributed by the company are not in line with today's
Senast uppdaterad: 2024-07-03
Användningsfrekvens: 1
Kvalitet:
Referens:
can not be reduced due to cost up
can not be reduced because cost up
Senast uppdaterad: 2019-03-13
Användningsfrekvens: 1
Kvalitet:
Referens:
all detail complete as requested except for construction cost.
construction cost
Senast uppdaterad: 2020-07-09
Användningsfrekvens: 1
Kvalitet:
Referens:
how much is it going to cost me to buy my own house in malaysia?
can i etablish the business in penang
Senast uppdaterad: 2020-01-17
Användningsfrekvens: 1
Kvalitet:
Referens:
in addition, terdapat ramai pengkaji bersetuju bahawa emotional intelligence sangat memberi manfaat dan memberi kesan positif kepada their behaviour in the workplace as mention by mayer et al., 2004
the findings of the present study indicating ei has a strong effect on job and performance confirm the notion of mayer et al. (2000) that ei might bring fresh insights into organizational culture from a perspective of how it affects performance. in addition, there are many researchers who agree that emotional intelligence is very beneficial and has a positive impact on their behavior in the workplace as mentioned by mayer et al., 2004 which said “individuals with higher ei levels are
Senast uppdaterad: 2023-01-12
Användningsfrekvens: 1
Kvalitet:
Referens:
penterjemtranslatewith the issuance of perakuan bayaran penultimate no. 1 kepada pihak kontaktor (in april 2013), we have made a computation on the final consultancy fees as summarised below. the fees comprise the scale of fees for the cost of works (rm91,975,223.45) and r. c. portion (rm30,079,647.80). the details are given in the attachment of the letter. ahan
scheduled maintenance is a stitch-in-time procedure and incorporates