尝试学会如何从人工翻译例句找到译文。
来自专业的译者、企业、网页和免费的翻译库。
kapag natapos na
it's over
最后更新: 2020-12-08
使用频率: 1
质量:
参考:
bilang graduating students, wala ng mas isasaya pa kapag natapos na ang internship
as a graduate student, there is nothing more satisfying than completing an internship.
最后更新: 2023-06-10
使用频率: 1
质量:
参考:
maaasahan niyo na magiging kumpleto pagpasok ko kapag natapos na problema ko
maaasahan niyo na magiging kumpleto pagpasok ko kapag natapos na problema ko
最后更新: 2020-11-30
使用频率: 1
质量:
参考:
natapos na ang huling trabaho ko noong
i'm done with my job
最后更新: 2021-04-17
使用频率: 1
质量:
参考:
mamaya kapag natapos na ang lahat gusto kong ipakita sa iyo kung gaano kami kabilib sa pamamagitan ng pag-donate nang malaki para sa kampanya mo.
i think by the end of the evenings out would like to show you just how impressed we are by writing a very large check for your campaign.
最后更新: 2016-10-27
使用频率: 1
质量:
参考:
kapag natapos na ang transaction at nakapag bigay na ang vendee ng kanyang partial payment ay hindi na pwede itong umatras sa transaction bagkus kailangan nyang bayaran an kanyang remaining balance
when he has paid his balance, he will only be told that he bought the house
最后更新: 2021-12-20
使用频率: 1
质量:
参考:
alam mo mustafa minahal kita ng totoo pero sinayanf mulang ang pag mamahal ko sayo sana maging masaya ka at hindi ka iwan ng babaeng mamahalin mo paalam na sayo kapag natapos na yung tatlong buwan uuwe nako ng pinas hindi nako babalik hahanapin ko na ang buhay ko sa philippinas tandaan mo mahal na mahal kita
salamat sa isang buwan nating pag sasama kahit maikli lang ang ating pag sasama masayang masaya ako natikman koden maging masaya kahit saglit lng lage mung tandaan mahal na mahal kita kahit kailan hindi na tayo mag kikita ingat palage
最后更新: 2021-05-06
使用频率: 1
质量:
参考:
hindi lahat ng proyekto ay may isang sukat na akma sa lahat ng pamamaraan. kapag ang isang negosyo ay may isang bagong sitwasyon na kailangang matugunan, ang isang solong plano sa paggamit ay dapat na dinisenyo upang mahawakan ito. kapag natapos na ang project at naisakatuparan na ang end result, yun na yun. hindi na ito maaaring gamitin dahil ang anumang iba pang mga hinaharap na proyekto ay kailangan ng isang sariwang solong gamitin ang plano.
not every project has a one size fits all approach. when a business has a new situation that needs to be addressed, a single use plan must be designed to handle it. once the project is over and the end result is realized, that’s it. it can’t be used anymore since any other future project will need a fresh single use plan.
最后更新: 2022-10-11
使用频率: 1
质量:
参考:
sinimulan na ng department of public works and highways (dpwh) ang mga civil works para sa extension building ng polytechnic university of the philippines college of engineering and architecture (pup cea) sa sta. mesa, maynila. sinabi ni dpwh secretary manuel m. bonoan, na binanggit ang ulat mula kay dpwh national capital region director loreta m. malaluan, na isang pormal na groundbreaking ceremony para sa bagong four storey building project ng pup sta. isinagawa kamakailan ng mesa campus,a hudyat ng pagsisimula ng mga gawain sa pagtatayo. sinabi ni director malauan na ang modernong gusali na may sukat na 477 metro kuwadrado, ay magbibigay ng kinakailangang karagdagang espasyo at pasilidad para sa mga mag-aaral at faculty member ng pup-cea. “kapag natapos na, ang extension campus ay magbibigay ng karagdagang mga silid-aralan, laboratoryo, library, audio-visual room, opisina ng faculty, at mas malalaking function room, na kumpleto sa air-conditioning system para sa mas magandang kapaligiran sa pag-aaral para sa mga mag-aaral sa engineering at architecture. and faculty members,” - direktor malaluan. ang bagong pup-cea building project na nagkakahalaga ng p94.35 milyon ay itatayo ng dpwh ncr sa loob ng 360 araw sa kalendaryo, o halos isang taon.
the department of public works and highways (dpwh) has started the civil works for the extension building of the polytechnic university of the philippines college of engineering and architecture (pup cea) in sta. mesa, manila. dpwh secretary manuel m. said bonoan, citing the report from dpwh national capital region director loreta m. dirty, which is a formal groundbreaking ceremony for pup sta's new four storey building project. recently conducted by mesa campus, n
最后更新: 2023-12-11
使用频率: 1
质量:
参考: