after traunfellner had provided the requested documents and explanations, the federal road construction division of the government of the land of niederösterreich drew up a technical test report in which it was stated that experience gathered from previous contracts had shown that, despite careful execution of an asphalt design of this kind in compliance with the contract, grooves of some considerable depth had appeared after a short time, which had called for additional repair work.
Προδικαστική «Οδηγία 93/37/ΕΟΚ — Συμβάσεις δημοσίων έργων — Έννοια της εναλλακτικής προσφοράς — Προϋποθέσεις λήψεως υπόψη και αξιολογήσεως στο πλαίσιο της διαδικασίας αναθέσεως του δημοσίου έργου» (Έκτο τμήμα)