From professional translators, enterprises, web pages and freely available translation repositories.
want to get away from it all?
want to get away from it all?
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
if you want to learn how to be strong fight alone
if you want to be strong learn how to fight alone
Last Update: 2016-06-23
Usage Frequency: 1
Quality:
Reference:
Нейната солова кариера започва през 1963 г., когато се появява енергичния поп хит "i only want to be with you".
her solo career began in 1963 with the upbeat pop hit, "i only want to be with you".
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
* if you want to be rich & happy: don't go to school?
: ensuring lifetime security for yourself and your children" (1992).
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
Изкаш ли да изтриеш следната задача от do you want to delete the following task from the таблицата:x?
do you want to delete the following task from the schedule:x?
Last Update: 2013-04-03
Usage Frequency: 1
Quality:
Reference:
it's not saying we even want to get along, but that we have to get along together in this world if it is to survive.
it's a reminder that we have no choice".
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
През 1998 г. Пери помага за създаването на първия хит номер едно в класациите "i don't want to miss a thing" заедно с поп поетесата Даян Уорън.
in 2006, perry performed alongside steven tyler for a three-song medley ("dream on", "walk this way", "i don't want to miss a thing") with the boston pops orchestra as part of a nationally-televised event to celebrate the fourth of july in boston, massachusetts.
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
Потвърдете съобщението "do you want to install the software", питащо Ви дали искате да инсталирате софтуера.
approve the 'do you want to install the software' message.
Last Update: 2010-03-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
Робърт Плант използва фразата в "whole lotta love" (1968) "shake for me girl, i want to be your back-door man.
robert plant references the dixon song in led zeppelin's "whole lotta love" (1969): "shake for me girl, i want to be your back-door man.
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
flushing there are times when you only want to flush the fluid manifold, such as: • breaks in spraying • overnight shutdown • end of potlife in this manual, that procedure is referred to as fluid manifold flushing. you can flush the fluid manifold by connecting a solvent pump to the fluid manifold. other times, you need to flush the entire system: • first time material is loaded into equipment* • color change • servicing • shutting down equipment for more than 3-1/2 hours (depends on material) • putting equipment into storage * some full system flushing steps are not necessary for initial flushing, as no material has been loaded into the system yet. to flush the entire system, you first follow the fluid manifold flushing procedure, at right, then the full system flushing procedure, page 18. fluid manifold flushing using solvent pump warning read warnings, page 5. • use the lowest possible pressure when flushing to avoid splashing. • before color change or shutdown for storage, flush at a higher flow rate and for a longer time. • a circulation setting is available. consult your distributor. refer to page 27. 1. follow pressure relief procedure, page 14. engage trigger lock. remove spray tip. 2. ensure that shutoff valves ga and gb are open. connect solvent pump line to solvent purge valve ja and jb. turn on solvent pump and open solvent purge valve ja. 3. adjust solvent pump regulator to desired pressure; use lowest pressure possible. ti1948a ti4699a jb
flushing there are times when you only want to flush the fluid manifold, such as: • breaks in spraying • overnight shutdown • end of potlife in this manual, that procedure is referred to as fluid manifold flushing. you can flush the fluid manifold by connecting a solvent pump to the fluid manifold. other times, you need to flush the entire system: • first time material is loaded into equipment* • color change • servicing • shutting down equipment for more than 3-1/2 hours (depends on material) • putting equipment into storage * some full system flushing steps are not necessary for initial flushing, as no material has been loaded into the system yet. to flush the entire system, you first follow the fluid manifold flushing procedure, at right, then the full system flushing procedure, page 18. fluid manifold flushing using solvent pump warning read warnings, page 5. • use the lowest possible pressure when flushing to avoid splashing. • before color change or shutdown for storage, flush at a higher flow rate and for a longer time. • a circulation setting is available. consult your distributor. refer to page 27. 1. follow pressure relief procedure, page 14. engage trigger lock. remove spray tip. 2. ensure that shutoff valves ga and gb are open. connect solvent pump line to solvent purge valve ja and jb. turn on solvent pump and open solvent purge valve ja. 3. adjust solvent pump regulator to desired pressure; use lowest pressure possible. ti1948a ti4699a jb ja ga gb flushing 309908g
Last Update: 2012-07-04
Usage Frequency: 1
Quality:
Reference: