From professional translators, enterprises, web pages and freely available translation repositories.
layout
ሁኔታ፦
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
default layout
የነበረው
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
layout _options...
የሥዕል ምርጫዎችን፦
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
view as grid
thumbnail-size
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
_snap to grid
ማስመሪያዎች አሳይ (_r)
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
keyboard layout "%s"
የxkb ፊደል ሠሌዳው እቅድ
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
Warning: Contains invisible HTML formatting
contact layout style
አልተገኘም
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
capslock key changes layout.
እቅዱ ምረጡ።
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
alt+control changes layout.
እቅዱ ምረጡ።
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
grid line color
የመስመር ቀለም
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
sna_p to grid
view-action
Last Update: 2014-08-20
Usage Frequency: 2
Quality:
configure image grid
ምስልን ለዋጭ
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
change grid background color
የመደቡን ቀለም ለውጥ
Last Update: 2014-08-20
Usage Frequency: 1
Quality:
configure the grid for this image
image-action
Last Update: 2014-08-20
Usage Frequency: 2
Quality:
the new text layout cannot be generated. most likely the font size is too big.
text-box-mode
Last Update: 2014-08-20
Usage Frequency: 2
Quality:
executive summary 1. brief description of the project 2. brief profile of the entrepreneur 3. project's contributions to the economy 1. sales and marketing 1.1 product description 1.2 competitors' 1.3 location 1.4 market area 1.5 main customers 1.6 total demand 1.7 market share 1.8 selling price 1.9 sales forecast 1.10 promotional measures 1.11 marketing strategy 1.12 marketing budget 2. production 2.1 production process 2.2 fixed capital 2.3 life of fixed capital 2.4 maintenance and repairs 2.5 sources of equipment 2.6 planned capacity 2.7 future capacity 2.8 terms and conditions of purchase of equipment 2.9 factory location and layout 2.10 raw materials needed 2.11 cost of raw materials 2.12 raw materials availability 2.13 labor 2.14 cost of labor 2.15 labor availability 2.16 labor productivity 2.17 factory overhead expenses 2.18 production cost 3. organization and management 3.1 form of business 3.2 organizational structure 3.3 business experience and qualifications of the entrepreneur 3.4 pre-operating activities 3.5 pre-operating expenses 3.6 office equipment 3.7 administrative expenses 4. financial plan 4.1 project cost 4.2 financing plan and loan requirement 4.3 security for loan 4.4 profit and loss statement 4.5 cash flow statement 4.6 balance sheet 4.7 loan repayment schedule 4.8 break-even point (bep) 4.9 return on investment (roi) 4.10 financial analysis
amharic
Last Update: 2021-12-25
Usage Frequency: 1
Quality:
Reference: