Results for work method statement translation from English to Arabic

English

Translate

work method statement

Translate

Arabic

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Arabic

Info

English

work method statement

Arabic

بيان طريقة العمل

Last Update: 2021-03-12
Usage Frequency: 1
Quality:

Reference: Anonymous

English

method statement

Arabic

بيان طريقة العمل

Last Update: 2020-01-13
Usage Frequency: 1
Quality:

Reference: Anonymous

English

work method

Arabic

أسلوب العمل

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Anonymous

English

method statements

Arabic

طريقة التنفيذ

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

pil state that they were awaiting the method statement from uem for fencing

Arabic

صرحت شركة بارسونز أنها في انتظار طريقة التنفيذ التي ستقدمها مجموعة المهندسين المتحدين الماليزية والخاصة

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

it was again mentioned in the method statement that sc-type i is used.

Arabic

وقد ذُكر مرة أخرى في بيان أسلوب العمل أن النوع sc-type i هو النوع المُستخدمk

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

method statements for all works

Arabic

بيان طرق التنفيذ لكل الأعمال

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

risk assessments & method statements

Arabic

تقييم المخاطر وبيانات المنهجية

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous
Warning: Contains invisible HTML formatting

English

work methods

Arabic

أساليب العمل

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Anonymous

English

the group's work method even denies uganda a right of reply.

Arabic

بل إن أسلوب عمل الفريق يحرم أوغندا من حق الرد.

Last Update: 2016-12-01
Usage Frequency: 1
Quality:

Reference: Anonymous

English

the level 3 schedule shall accompany the contractor’s submission of the method statement for that portion of the work.

Arabic

ويُرفق به موافقة المقاول على أسلوب تنفيذ هذا الجزء من العمل.

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

security council reform is not a stereotyped issue of expanding its membership and modifying its work method.

Arabic

وإصلاح مجلس الأمن ليس مسألة مقولبة لتوسيع عضويته وتعديل أسلوب عمله.

Last Update: 2016-12-01
Usage Frequency: 3
Quality:

Reference: Anonymous

English

each method statement shall address the main steps of the work and how those steps will be executed, by which means, methods and equipment.

Arabic

يجب أن يتضمن كل بيان خاص بطرق التنفيذ الخطوات الرئيسية للعمل وكيفية تنفيذ تلك الخطوات ووسائل تنفيذها والمعدات المستخدمة.

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

method statements shall address the following topics with relation to the work:

Arabic

يجب أن يتضمن بيان طرق التنفيذ الموضوعات التالية المتعلقة بالعمل:

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

work methods of the chief executives board

Arabic

دال - أساليب عمل مجلس الرؤساء التنفيذيين

Last Update: 2016-12-01
Usage Frequency: 3
Quality:

Reference: Anonymous

English

comply with formal method statements or permit to work systems related to the nature of the work.

Arabic

التزم بإصدار بيانات للطريقة الرسمية أو السماح بأنظمة العمل المرتبطة بطبيعة العمل.

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

contractor must gain the approval of the company for all method statements for all works prior to commencing such works.

Arabic

يجب على المقاول الحصول على موافقة الشركة على جميع طرق التنفيذ الخاصة بكافة الأشغال وذلك قبيل البدء فيها,

Last Update: 2020-04-24
Usage Frequency: 1
Quality:

Reference: Anonymous

English

achieving those goals would require different work methods.

Arabic

38 - وسيتطلب تحقيق هذه الأهداف أساليب عمل مختلفة.

Last Update: 2018-06-30
Usage Frequency: 4
Quality:

Reference: Anonymous

English

the note demonstrates that the work methods are sound and should be continued.

Arabic

فالمذكّرة تُظهر أن طرائق العمل سليمة وينبغي مواصلة اتّباعها.

Last Update: 2016-12-01
Usage Frequency: 3
Quality:

Reference: Anonymous

English

organization of work: methods of work of the sub-commission

Arabic

تنظيم العمل: أساليب عمل اللجنة الفرعية

Last Update: 2016-12-01
Usage Frequency: 4
Quality:

Reference: Anonymous

Get a better translation with
10,290,037,133 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK