Results for method statements translation from English to Dutch

English

Translate

method statements

Translate

Dutch

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Dutch

Info

English

statements

Dutch

verklaringen

Last Update: 2017-04-06
Usage Frequency: 6
Quality:

English

statements:

Dutch

toespraken door:

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

English

method statement

Dutch

methode verklaring

Last Update: 2021-10-14
Usage Frequency: 1
Quality:

Reference: Anonymous

English

7 financial statements in which the equity method is applied are not separate financial statements.

Dutch

7 een jaarrekening waarin de "equity-methode" wordt toegepast, is geen enkelvoudige jaarrekening.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: Anonymous
Warning: Contains invisible HTML formatting

English

a statement with description of the analytical method if specific analyses were performed,

Dutch

een verklaring met de beschrijving van de analysemethode indien specifieke analyses zijn uitgevoerd;

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: Anonymous

English

associated undertakings should be included in consolidated financial statements by means of the equity method.

Dutch

geassocieerde ondernemingen moeten in de geconsolideerde financiële overzichten worden opgenomen volgens de vermogensmutatiemethode.

Last Update: 2014-11-08
Usage Frequency: 1
Quality:

Reference: Anonymous

English

the court now wants to bring forward a refined method of producing this positive statement of assurance.

Dutch

nu wil de kamer een verfijndere methode ontwikkelen voor de opstelling van de betrouwbaarheidsverklaring.

Last Update: 2012-02-29
Usage Frequency: 3
Quality:

Reference: Anonymous

English

the accounting policy adopted for government grants, including the methods of presentation adopted in the financial statements;

Dutch

de grondslagen voor financiële verslaggeving die werden toegepast voor overheidssubsidies, met inbegrip van de in de jaarrekening toegepaste presentatiemethoden;

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: Anonymous

English

the income statement liability method focuses on timing differences, whereas the balance sheet liability method focuses on temporary differences.

Dutch

de winst-en-verliesrekeningmethode richt zich op periodeverschuivingen, terwijl de balansmethode zich richt op tijdelijke verschillen.

Last Update: 2014-11-21
Usage Frequency: 1
Quality:

Reference: Anonymous

English

"the film something without sequelae, as specified in the auction method statement on the auction in advance of the auction is not fidelity exemption.

Dutch

"de film iets zonder gevolgen, zoals gespecificeerd in de veiling methode verklaring over de veiling van tevoren van de veiling is niet trouw vrijstelling.

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Reference: Anonymous
Warning: Contains invisible HTML formatting

English

in cases where items of basic information are supplied to member states by the commission (eurostat), the commission shall transmit a method statement to enable the member states to conduct a plausibility check.

Dutch

als de commissie (eurostat) de lidstaten basisgegevens levert, vermeldt zij de voor deze gegevens gebruikte methodiek, zodat de lidstaten een plausibiliteitscontrole kunnen uitvoeren.

Last Update: 2017-04-06
Usage Frequency: 2
Quality:

Reference: Anonymous

English

statement:

Dutch

verklaring:

Last Update: 2018-02-13
Usage Frequency: 17
Quality:

Reference: Anonymous

Get a better translation with
10,247,784,068 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK