From professional translators, enterprises, web pages and freely available translation repositories.
the electricity interconnector linking latvia and estonia is regularly congested, suggesting that improved connections are needed.
läti ja eesti vaheline elektriühendus on pidevalt ülekoormatud, mis osutab vajadusele paremate ühenduste järele.
2015 also saw the inauguration of a new france-spain electricity interconnector, doubling the transmission capacity between the two countries.
aastal 2015 hakkas tööle ka prantsusmaa ja hispaania vaheline uus elektriühendus, millega nende kahe riigi vastastikune ülekandevõimsus kahekordistus.
the guidelines for the ten-e have also identified a southern interconnector for the baltic republics, the link poland-lithuania.
vastavalt ten-e suunistele on kavas ka balti riikide lõunapoolne elektrienergiaühendus läbi leedu ja poola.
interconnector between turkey and bulgaria with a minimum capacity of 3 bcm/a [currently known as “itb”]
türgi ja bulgaaria ühendus minimaalse suutlikkusega 3 miljardit kuupmeetrit aastas (praegu tuntud projektina „itb”)
cluster israel – cyprus – greece between hadera and attica region [currently known as the euro asia interconnector] including the following pcis:
klaster iisrael–küpros–kreeka, hadera ja atika piirkonna vahel (praegu tuntud projektina euro asia interconnector), mis hõlmab järgmisi ühishuviprojekte: