Results for dry ginger translation from English to Gujarati

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Gujarati

Info

English

dry ginger

Gujarati

sunth

Last Update: 2016-12-09
Usage Frequency: 2
Quality:

Reference: Anonymous

English

ginger

Gujarati

આદુ

Last Update: 2014-01-25
Usage Frequency: 1
Quality:

Reference: Wikipedia

English

the lake is dry

Gujarati

તો હું શું કરી શકું

Last Update: 2024-01-29
Usage Frequency: 1
Quality:

Reference: Wikipedia

English

s8: keep container dry

Gujarati

please take the official translations! you find them here: http: // europa. eu. int/ eur- lex/ lex/ lexuriserv/ lexuriserv. do? uri=celex: 32001l0059: en: html

Last Update: 2018-12-24
Usage Frequency: 2
Quality:

Reference: Wikipedia

English

wait for the ink to dry

Gujarati

શાહી સૂકાય ત્યાં સુધી રાહ જુઓ

Last Update: 2018-12-23
Usage Frequency: 2
Quality:

Reference: Wikipedia

English

this is the same dry water body.

Gujarati

આ એ જ સુકાયેલુ પાણીનું સંગ્રહસ્થાન છે,

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

Reference: Wikipedia

English

hindi essay on dry trees autobiography

Gujarati

શુષ્ક ઝાડની આત્મકથા પર હિન્દી નિબંધ

Last Update: 2019-11-26
Usage Frequency: 1
Quality:

Reference: Anonymous

English

your dry fruit milk kulfi is ready.

Gujarati

તૈયાર છે ડ્રાયફ્રુટ મિલ્ક કુલ્ફી.

Last Update: 2019-06-28
Usage Frequency: 1
Quality:

Reference: Anonymous

English

even without dry fruits, the kulfi will taste great.

Gujarati

ડ્રાયફ્રુટ્સ વગર પણ કુલ્ફી આટલી જ ટેસ્ટી લાગશે.

Last Update: 2019-06-28
Usage Frequency: 1
Quality:

Reference: Anonymous

English

so when it's a dry and flat land, it crawls.

Gujarati

તેથી જ્યારે તે સૂકી હોય છે અને સપાટ જમીન, તે ક્રોલ કરે છે.

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

Reference: Anonymous

English

once the milk is reduced to a quarter, turn off the oven, and add cardamom and dry fruit pieces.

Gujarati

દૂધ ઉકળી-ઉકળીને પા ભાગનું થઈ જાય એટલે ગેસ બંધ કરી અંદર ઈલાયચી અને ડ્રાયફ્રુટ્સની કતરણ નાખો.

Last Update: 2019-06-28
Usage Frequency: 1
Quality:

Reference: Anonymous

English

please wait a few minutes for the ink to dry. profiling damp ink will produce a poor profile and may damage your color measuring instrument.

Gujarati

મહેરબાની કરીને શહીને સૂકી થવા માટે થોડી મિનિટો રાહ જુઓ. ભીની શહી નબળી રૂપરેખા બનાવશે અને તમારાં રંગ માપાંકન સાધનને ખરાબ કરી શકે છે.

Last Update: 2018-12-23
Usage Frequency: 2
Quality:

Reference: Anonymous

English

from pole, bottas got a good start and almost hung hamilton out to dry as he defended his position in the first two turns and invited vettel to attack his teammate.

Gujarati

પોલથી, બોટ્સને સારી શરૂઆત મળી અને લગભગ હેમિલ્ટનને ગંભીર શરૂઆત થઈ કારણ કે તેણે પ્રથમ સ્થાને તેની સ્થિતિનો બચાવ કર્યો અને વેટ્ટેલને તેના સાથી સાથે હુમલો કરવા આમંત્રણ આપ્યું.

Last Update: 2019-06-28
Usage Frequency: 1
Quality:

Reference: Anonymous

English

new delhi, sep 5 (ians) in a move to deal with the situation following the supreme court verdict holding allocation of coal blocks since 1993 as illegal, the power ministry in a cabinet note has proposed pooling of imported and domestic coal for deciding the price of fuel for plants commissioned after 2009. the proposal is aimed at meeting the increasing demand for coal in a situation where imports have become essential to tide over shortages, an official source told ians friday. the power ministry has proposed that imported coal be supplied to power plants after pooling its price with domestic coal in case the apex court decides to cancel captive coal blocks at its hearing on sep 9, the source said. the government has told the supreme court it was ready to auction the coal blocks if they are cancelled. the move follows the ministry's view that pre-2009 plants should be kept out of this arrangement as the share of the public sector is 98 percent of the total capacity. the official pointed out that the capacity created after 2009 is almost equally shared between both public and private sectors and, therefore, the price pooling mechanism would work out favourably for plants commissioned after that year. while state-miner coal india will work out the commercial arrangement for the import and supply of coal under the price pooling, this arrangement for power projects commissioned after 2009 is expected to raise power tariffs by 74 paise in 2014-15, 44 paise in 2015-16 and five paise in 2016-17, the source added. the ministry has said that for pre-2009 plants, the coal supply must be kept at the existing level of 90 percent of the annual contracted quantity. moreover, the arrangement will not be applicable to imported coal-based projects. power producers have been advised to import 54 million tonnes (mt) of coal in the current fiscal to tide over domestic supply shortages. "in view of shortage of domestic coal as of now, it would not be feasible to meet 100 percent requirement of power producer (including ntpc), from domestic coal production alone," coal and power minister piyush goyal recently told parliament in a written reply. coal imports in the last fiscal were 168.44 mt, while in 2012-13 india imported 145.785 mt of dry fuel. the total estimated quantum of coal resources in the country is 301.56 billion tonnes, while the coal extracted during 2013-14 was 565.64 mt.

Gujarati

શુદ્ધnew delhi, sep 5 (ians) in a move to deal with the situation following the supreme court verdict holding allocation of coal blocks since 1993 as illegal, the power ministry in a cabinet note has proposed pooling of imported and domestic coal for deciding the price of fuel for plants commissioned after 2009. the proposal is aimed at meeting the increasing demand for coal in a situation where imports have become essential to tide over shortages, an official source told ians friday. the power ministry has proposed that imported coal be supplied to power plants after pooling its price with domestic coal in case the apex court decides to cancel captive coal blocks at its hearing on sep 9, the source said. the government has told the supreme court it was ready to auction the coal blocks if they are cancelled. the move follows the ministry's view that pre-2009 plants should be kept out of this arrangement as the share of the public sector is 98 percent of the total capacity. the official pointed out that the capacity created after 2009 is almost equally shared between both public and private sectors and, therefore, the price pooling mechanism would work out favourably for plants commissioned after that year. while state-miner coal india will work out the commercial arrangement for the import and supply of coal under the price pooling, this arrangement for power projects commissioned after 2009 is expected to raise power tariffs by 74 paise in 2014-15, 44 paise in 2015-16 and five paise in 2016-17, the source added. the ministry has said that for pre-2009 plants, the coal supply must be kept at the existing level of 90 percent of the annual contracted quantity. moreover, the arrangement will not be applicable to imported coal-based projects. power producers have been advised to import 54 million tonnes (mt) of coal in the current fiscal to tide over domestic supply shortages. "in view of shortage of domestic coal as of now, it would not be feasible to meet 100 percent requirement of power producer (including ntpc), from domestic coal production alone," coal and power minister piyush goyal recently told parliament in a written reply. coal imports in the last fiscal were 168.44 mt, while in 2012-13 india imported 145.785 mt of dry fuel. t

Last Update: 2014-09-07
Usage Frequency: 1
Quality:

Reference: Anonymous
Warning: Contains invisible HTML formatting

Get a better translation with
7,802,545,858 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK