Results for ramadan is almost here translation from English to Gujarati

English

Translate

ramadan is almost here

Translate

Gujarati

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Gujarati

Info

English

which is why the best of design is almost always about decreasing uncertainty.

Gujarati

કઈ ડિઝાઇન સૌથી ઉતમ છે જે હંમેશા અનિશચિતતાના વિશે ઘટાડો કરે.

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

English

but identifying the actual losses to the economy is almost impossible to do unless we use copyright math.

Gujarati

પરંતુ અર્થતંત્ર માટેનું વાસ્તવિક નુકસાન ઓળખવું કરવા માટે લગભગ અશક્ય છે જ્યાંસુધી આપણે કૉપિરાઇટ ગણિત ઉપયોગ નથી કરતા

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

English

the so-called permanent ice, five years old or older, you can see is almost like blood, spilling out of the body here.

Gujarati

પાંચ વર્ષ કે તે પહેલાના તથાકથિત સ્થાયી હિમને આપ જોઇ શકો છો કે લગભગ લોહી જેવો જ છે, અહી શરીરમાંથી વહી રહેલ છે.

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

English

to put things into perspective, the us budget for the military marching bands alone is almost twice as much as the entire nea.

Gujarati

બધી વસ્તુઓને પર નજર કરીએ તો, us ના માત્ર સેના ના ચળવળ બેન્ડનું ભંડોળ આના કરતા બમણું છે.

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

English

tada falls is becoming famous among residents from chennai for trekking. you can park the vehicle near tada falls parking lot and follow the trail to trek to the tada falls. total trek is almost of 10 km through rough patches and rocky terrains.

Gujarati

ટાડા ધોધ ચેન્નાઇ શહેરના રહેવાસીઓમાં પદ‌આરોહણ (ટ્રેકિંગ) માટે પ્રખ્યાત બની રહ્યો છે. તમે પાર્કિંગ સુવિધા પાસે વાહન પાર્ક કરી અને જંગલ કેડીમાર્ગ દ્વારા પગપાળા ટાડા ધોધ જઈ શકો છો. કેડીમાર્ગનું કુલ અંતર લગભગ ૧૦ કિલોમીટર જેટલું ઉબડખાબડ જમીન અને ખડકાળ વિસ્તારમાંથી પસાર થાય છે. અહીં સાહસ પ્રેમીઓને વનભ્રમણ માટે માર્ગદર્શક (ગાઇડ) મળે છે.

Last Update: 2021-04-10
Usage Frequency: 1
Quality:

English

and so, if you can deal with the negatives, which are essentially the radiation, the footprint and cost, the potential, in terms of effect on land and various things, is almost in a class of its own.

Gujarati

જો નકારાત્મક પરિબળો ને નાથી શકો , મુખ્યતયા વિકિરણ ની સમસ્યા , તો તેની કિંમત, ક્ષમતા તેમ જ જમીન તેમ જ બીજા પરિબળો પર થનારી અસરો અપ્રતિમ હશે.

Last Update: 2020-12-03
Usage Frequency: 1
Quality:

English

new delhi, sep 5 (ians) in a move to deal with the situation following the supreme court verdict holding allocation of coal blocks since 1993 as illegal, the power ministry in a cabinet note has proposed pooling of imported and domestic coal for deciding the price of fuel for plants commissioned after 2009. the proposal is aimed at meeting the increasing demand for coal in a situation where imports have become essential to tide over shortages, an official source told ians friday. the power ministry has proposed that imported coal be supplied to power plants after pooling its price with domestic coal in case the apex court decides to cancel captive coal blocks at its hearing on sep 9, the source said. the government has told the supreme court it was ready to auction the coal blocks if they are cancelled. the move follows the ministry's view that pre-2009 plants should be kept out of this arrangement as the share of the public sector is 98 percent of the total capacity. the official pointed out that the capacity created after 2009 is almost equally shared between both public and private sectors and, therefore, the price pooling mechanism would work out favourably for plants commissioned after that year. while state-miner coal india will work out the commercial arrangement for the import and supply of coal under the price pooling, this arrangement for power projects commissioned after 2009 is expected to raise power tariffs by 74 paise in 2014-15, 44 paise in 2015-16 and five paise in 2016-17, the source added. the ministry has said that for pre-2009 plants, the coal supply must be kept at the existing level of 90 percent of the annual contracted quantity. moreover, the arrangement will not be applicable to imported coal-based projects. power producers have been advised to import 54 million tonnes (mt) of coal in the current fiscal to tide over domestic supply shortages. "in view of shortage of domestic coal as of now, it would not be feasible to meet 100 percent requirement of power producer (including ntpc), from domestic coal production alone," coal and power minister piyush goyal recently told parliament in a written reply. coal imports in the last fiscal were 168.44 mt, while in 2012-13 india imported 145.785 mt of dry fuel. the total estimated quantum of coal resources in the country is 301.56 billion tonnes, while the coal extracted during 2013-14 was 565.64 mt.

Gujarati

શુદ્ધnew delhi, sep 5 (ians) in a move to deal with the situation following the supreme court verdict holding allocation of coal blocks since 1993 as illegal, the power ministry in a cabinet note has proposed pooling of imported and domestic coal for deciding the price of fuel for plants commissioned after 2009. the proposal is aimed at meeting the increasing demand for coal in a situation where imports have become essential to tide over shortages, an official source told ians friday. the power ministry has proposed that imported coal be supplied to power plants after pooling its price with domestic coal in case the apex court decides to cancel captive coal blocks at its hearing on sep 9, the source said. the government has told the supreme court it was ready to auction the coal blocks if they are cancelled. the move follows the ministry's view that pre-2009 plants should be kept out of this arrangement as the share of the public sector is 98 percent of the total capacity. the official pointed out that the capacity created after 2009 is almost equally shared between both public and private sectors and, therefore, the price pooling mechanism would work out favourably for plants commissioned after that year. while state-miner coal india will work out the commercial arrangement for the import and supply of coal under the price pooling, this arrangement for power projects commissioned after 2009 is expected to raise power tariffs by 74 paise in 2014-15, 44 paise in 2015-16 and five paise in 2016-17, the source added. the ministry has said that for pre-2009 plants, the coal supply must be kept at the existing level of 90 percent of the annual contracted quantity. moreover, the arrangement will not be applicable to imported coal-based projects. power producers have been advised to import 54 million tonnes (mt) of coal in the current fiscal to tide over domestic supply shortages. "in view of shortage of domestic coal as of now, it would not be feasible to meet 100 percent requirement of power producer (including ntpc), from domestic coal production alone," coal and power minister piyush goyal recently told parliament in a written reply. coal imports in the last fiscal were 168.44 mt, while in 2012-13 india imported 145.785 mt of dry fuel. t

Last Update: 2014-09-07
Usage Frequency: 1
Quality:

Reference: Anonymous
Warning: Contains invisible HTML formatting

Some human translations with low relevance have been hidden.
Show low-relevance results.

Get a better translation with
8,891,233,189 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK