From professional translators, enterprises, web pages and freely available translation repositories.
hans peter schmid and his team had a total of three months for planning, preparation, installation and setting up until from the 23rd of january it becomes essential that every ground fault circuit interrupter holds, every lamp lights, none of the pcs crash and every participant can communicate with the whole world precisely according to his/her wishes.
schmid e il suo team hanno avuto tre mesi di tempo per progettare, preparare, installare e allestire il tutto affinché a partire dal 23 gennaio ogni interruttore differenziale tenga, ogni lampada si accenda, nessun pc vada in tilt e ogni partecipante possa comunicare con il mondo intero secondo le sue esigenze.
the main purpose of the dv928 is to evaluate the efficacy of ground fault blow-out systems (petersen coil, shunt, etc.), on mt networks with isolated or compensated neutral and to perform several system monitoring functions useful for diagnostic purposes (checking of mt switch opening and shunt times).
lo scopo principale del dv928 è quello di valutare l’efficacia dei sistemi di estinzione dei guasti a terra (bobina di petersen, shunt, ecc.), sulle reti mt a neutro isolato o compensato e di effettuare alcune funzioni di monitoraggio impianto utili ai fini diagnostici (controllo dei tempi di apertura degli interruttori mt e shunt).