From professional translators, enterprises, web pages and freely available translation repositories.
mobile gantry crane feeder server
pārvietojams portālceltnis feeder server
Last Update: 2012-03-28
Usage Frequency: 2
Quality:
container gantry crane feeder server
konteineru portālceltnis feeder server
Last Update: 2012-03-28
Usage Frequency: 12
Quality:
gantry crane terminal server
portālceltnis terminal server
Last Update: 2012-03-28
Usage Frequency: 8
Quality:
container gantry crane barge server
konteineru portālceltnis barge server
Last Update: 2012-03-28
Usage Frequency: 18
Quality:
feeder server
feeder server
Last Update: 2012-03-28
Usage Frequency: 4
Quality:
container gantry crane
konteineru portālceltnis
Last Update: 2014-09-28
Usage Frequency: 4
Quality:
container gantry crane kranich
konteineru portālceltnis kranich
Last Update: 2012-03-28
Usage Frequency: 2
Quality:
container gantry crane barge service
konteineru portālceltnis barge service
Last Update: 2012-03-28
Usage Frequency: 2
Quality:
transporter cranes, gantry cranes and bridge cranes
pārvietojamie celtņi, portālceltņi un tilta celtņi
Last Update: 2014-11-21
Usage Frequency: 9
Quality:
overhead travelling cranes, transporter cranes, gantry cranes, bridge cranes, mobile lifting frames and straddle carriers
tilta celtņi, pastatņu celtņi, portālceltņi, pārvietojama pacēlājkāpnes un portāliekrāvēji
Last Update: 2014-11-21
Usage Frequency: 2
Quality:
the 2004 restructuring plan explains that the factors which contributed to the difficult financial situation were external, such as asian competition, the upturn in the zloty against the dollar, rising steel prices and problems with accessing funding following the bankruptcy of stocznia szczecin porta holding s.a. and the collapse of a gantry crane at the gdynia yard during a violent storm in 1999.
2004. gada pārstrukturēšanas plānā ir izskaidrots, ka grūtās finansiālās situācijas rašanos veicināja ārēji faktori, piemēram, konkurence no Āzijas, zlotu vērtības palielināšanās pret dolāru, tērauda cenu kāpums un finansiālas problēmas pēc stocznia szczecin porta holding s.a. bankrota un portālceltņa sabrukšanas gdiņas būvētavā stipras vētras laikā 1999. gadā.
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
(32) investments in comparable movable capital assets, such as container bridges, ship-to-shore gantry cranes, bridge unloaders and specialised tugboats, should be put on an equal footing with investments in immovable assets.
(32) ieguldījumiem salīdzināmajos kustamajos pamatlīdzekļos, tādos kā konteineru tilti, celtņa krāni, tiltu izkrāvēji un specializēti velkoņi, ir jābūt vienādā kopsummā ar ieguldījumiem nekustamajos īpašumos.
Last Update: 2017-04-06
Usage Frequency: 1
Quality: