Results for safe work method statement translation from English to Malay

English

Translate

safe work method statement

Translate

Malay

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Malay

Info

English

safe work method statement

Malay

penyataan kaedah kerja selamat

Last Update: 2020-06-16
Usage Frequency: 1
Quality:

Reference: Anonymous

English

method statement

Malay

kaedah pernyataan

Last Update: 2020-06-05
Usage Frequency: 3
Quality:

Reference: Anonymous

English

method statement column repair

Malay

method statement

Last Update: 2016-08-19
Usage Frequency: 1
Quality:

Reference: Anonymous

English

safe work practices

Malay

amalan kerja selamat

Last Update: 2015-05-12
Usage Frequency: 1
Quality:

Reference: Anonymous

English

utility diversion: implementing kick off meeting and solving related utility problems such as paip pahang, tnb, telekom malaysia and maxis regarding method statement, work start date, revised drawing, shop drawing, diversion problems and others.

Malay

mesyuarat cpm: membincangkan masalah teknikal berkenaan microsoft project dimana cpm yang dihasilkan mempunyai perbezaan antara fizikal dan financial melebihi 10% membincangkan antara punca- punca kelewatan projek dan recovery plan

Last Update: 2023-12-04
Usage Frequency: 1
Quality:

Reference: Anonymous

English

this method statement applies to all the civil works excavation including ground preparation, setting out, backfilling, soil compaction, concreting, waterproofing, masonry, plastering, joinery related to the construction of building as per project requirements, referring with approved civil and mep drawing.

Malay

penyata kaedah ini terpakai kepada semua kerja-kerja sivil penggalian termasuk penyediaan tanah, penetapan, backfilling, pemadatan tanah, konkrit, kalis air, batu, melepa, cantuman yang berkaitan dengan pembinaan bangunan mengikut keperluan projek, merujuk kepada lukisan sivil dan mep yang diluluskan.

Last Update: 2023-09-12
Usage Frequency: 2
Quality:

Reference: Anonymous

English

dear all, as we are aware, mygaz should have provided the correct information to jmht regarding jkj 103. when mygaz gives the wrong information, it causes our party to be subjected to swo (stop work order) by penang port. on my own initiative, i have also met with oshe. i have also appealed to oshe to grant temporary permission pending approval from dosh. all our documents are complete, either from the jsa / method statement which

Malay

dear all, seperti mana kita sedia maklum, mygaz sepatutnya memberikan maklumat yang betul kpd pihak jmht berkaitan jkj 103. bilamana pihak mygaz memberikan info yg salah, ianya menyebabkan pihak kami dikenakan swo (stop work order) oleh pihak penang port. atas inisiatif, sy juga telah berjumpa dgn pihak oshe. sy jua telah merayu kepada pihak oshe utk memberikan kebenaran sementara menunggu kelulusan dari pihak dosh. segala dokumen kami telah lengkap, either dr jsa / method statement yang mana

Last Update: 2022-05-21
Usage Frequency: 1
Quality:

Reference: Anonymous

Get a better translation with
10,388,471,977 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK