From professional translators, enterprises, web pages and freely available translation repositories.
so mw
kaya mw
Last Update: 2021-07-10
Usage Frequency: 1
Quality:
Reference:
parenting with mw
parenting with me
Last Update: 2024-01-05
Usage Frequency: 1
Quality:
Reference:
lajn pa voye mw pu
lajn pa voye mw pu
Last Update: 2024-05-12
Usage Frequency: 1
Quality:
Reference:
are you happy with mw
masaya ka ba kapag kasama mo ako
Last Update: 2021-07-22
Usage Frequency: 1
Quality:
Reference:
want mw to be your lawful wife
want mw to be your lawful wife.
Last Update: 2024-11-17
Usage Frequency: 1
Quality:
Reference:
how would you feel being with mw
why are you like that
Last Update: 2019-11-24
Usage Frequency: 1
Quality:
Reference:
if i show you my flaws would you love mw the same?
"if i show you my flaws if i couldn't be strong tell me, honestly would you still love me the same?
Last Update: 2024-12-21
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
u,re lucky if u got mw attention cause i ignore everyone
u,re lucky if u got mw attention cause i ignore everyone.
Last Update: 2024-04-12
Usage Frequency: 1
Quality:
Reference:
enggy b mw hahhaa piyakapagengud ka pen c ate cathy na sa super pen😂😂😂
enggy b mw hahhaa piyakapagengud ka pen c ate cathy na sa super pen😂😂😂
Last Update: 2021-06-17
Usage Frequency: 1
Quality:
Reference:
wa ko usyan kya paano kua nag hmbal byy knu ung ging baydan nna na wa lun permahan ang pagkabate tna ni angkol aiii tpos lun bayad ... kya to wa run tna mw nagbayad
wa ko usyan kya paano kua nag hmbal byy knu ung ging baydan nna na wa lun permahan ang pagkabate tna ni angkol aiii tpos lun bayad ...kya to wa run tna mw nagbayad
Last Update: 2021-09-14
Usage Frequency: 1
Quality:
Reference:
power supply shortage is not only common to luzon but in the whole country. communities face rotating brown out to cope up to this situation. according to the government's power development plan for 2017 to 2040 forecasts. there will be an annual 5 percent growth in the demand for electricity. it is predicted to reach 49,287 mw in 2040. therefore, the country needs 43,765 mw of added capacity to come available. the need to conserve is crucial but we need more power to deal with it. we need to bo
power supply shortage is not only common to luzon but in the whole country. communities face rotating brown out to cope up to this situation. according to the government's power development plan for 2017 to 2040 forecasts. there will be an annual 5 percent growth in the demand for electricity. it is predicted to reach 49,287 mw in 2040. therefore, the country needs 43,765 mw of added capacity to come available. the need to conserve is crucial but we need more power to deal with it. we need to boost and support all renewable energy as alternatives such as windmills, solar energy, and hydropower plants. energy security and issues on high energy prices should also be considered as we find solutions (the manila times, 2020).
Last Update: 2025-01-10
Usage Frequency: 1
Quality:
Reference: