From professional translators, enterprises, web pages and freely available translation repositories.
1 (pm)
1 (pm)
Last Update: 2018-02-13
Usage Frequency: 13
Quality:
pm(1)
fr(1)
Last Update: 2016-09-30
Usage Frequency: 1
Quality:
- 1 pm 4, ou
1 premolar 4, or
Last Update: 2018-02-13
Usage Frequency: 1
Quality:
2 pm (1)
marzo 31, 2012 (1)
Last Update: 2018-02-13
Usage Frequency: 1
Quality:
est 1-pm-2-3-4.
1-n-2-3-4.
Last Update: 2018-02-13
Usage Frequency: 1
Quality:
nombre de particules(1) (pm)
mass of carbon monoxide (co) l1 (mg/km)
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
pm (1) nombre
pm (1) number
Last Update: 2017-04-06
Usage Frequency: 1
Quality:
pm 1 fred millar:
cpo fred millar:
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
pm-suspend (1).
hald(8), lshal(1), hal-get-property(1), hal-find-by-property(1), hal-find-by-capability(1)
Last Update: 2018-02-13
Usage Frequency: 1
Quality:
1 pm = boîte au point mort, embrayage embrayé.
1 pm = gearbox in neutral, clutch engaged.
Last Update: 2016-12-01
Usage Frequency: 4
Quality:
nombre de particules(1) (pm) l5 (#/km)
number of particulates(1) (pm)
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
total petits travaux de manufacture = 1+ pm autres
measures taken to combat undeclared work
Last Update: 2014-02-06
Usage Frequency: 1
Quality:
"(1) pm = boîte au point mort, embrayage embrayé.
"(1) pm = gearbox on neutral, clutch engaged
Last Update: 2016-09-30
Usage Frequency: 4
Quality:
Warning: Contains invisible HTML formatting
nombre de particules(1) (pm) l5 (#/km) pi ci
number of particulates(1) (pm) l5 (#/km) pi ci
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
26cm (pm=302,5g) (1)
12 cm (lt) (1)
Last Update: 2018-02-13
Usage Frequency: 1
Quality:
wednesday to saturday 10 am - 4pm sunday, 1 pm - 4 pm fermé :
wednesday to saturday 10 am - 4pm sunday, 1 pm - 4 pm closed:
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
monday thru saturday 9 am - 5 pm, sunday 1 pm - 5 pm fermé :
monday thru saturday 9 am - 5 pm, sunday 1 pm - 5 pm closed:
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
12 voir annexe iii. 13 mr aliev took part in the visit until wednesday 21 march 2001 1 pm.
12 see appendix iii 13 mr aliev took part in the visit until wednesday 21 march 2001 1 pm.
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
elle fait partie du south alberta light horse et est affectée au 1 pm, à edmonton. par pte melissa spence
a clerk, she is from south alberta light horse, attached-posted to 1 mp unit in edmonton. by pte melissa spence
Last Update: 2015-05-14
Usage Frequency: 1
Quality:
dents: absence de plus de 2 prémolaires 1 (pm 1) et d’une autre dent.
· teeth: more than two p1 plus one other tooth missing.
Last Update: 2018-02-13
Usage Frequency: 1
Quality: