From professional translators, enterprises, web pages and freely available translation repositories.
backhoe
jengtera kait
Last Update: 2020-03-23
Usage Frequency: 1
Quality:
Reference:
back load loader
backhoe loader
Last Update: 2020-01-21
Usage Frequency: 1
Quality:
Reference:
loader lori sampah
english
Last Update: 2024-04-29
Usage Frequency: 1
Quality:
Reference:
surat tawaran pemandu backhoe
backhoe driver offer letter
Last Update: 2024-12-12
Usage Frequency: 1
Quality:
Reference:
menyalin win32-loader ke binari
copy win32-loader into binary
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
gagal menambah bind-now-loader.
failed to add bind-now-loader.
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
kerja kerja mengali tanah pada kedalaman 1 kaki dengan menggunakan jentera backhoe
work on welding the ground at a depth of 1 foot using backhoe machinery
Last Update: 2023-10-19
Usage Frequency: 1
Quality:
Reference:
boot-loader di dalam jenis imej ini belum lagi disokong oleh live-build
bootloader in this image type not yet supported by live-build.
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
pengabaian win32-loader telah diset kepada betul tetapi tidak sesuai dengan arkitektur anda, abaikan.
win32-loader inclusion is set to true but not compatible with your architecture, ignoring.
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
dapatkan data peta terbaru gratis dengan map loader.! data peta pada perangkat anda mungkin akan terhapus oleh aplikasi ovi maps baru. dapatkan data peta terbaru gratis dengan map loader.
get the latest map data for free with map loader.! the map data on your device may be deleted by the new ovi maps application. get the latest map data for free with map loader.
Last Update: 2011-03-17
Usage Frequency: 9
Quality:
Reference:
setelah marking work area selesai , kerja kerja penggalian akan dijalankan. sewaktu proses penggalian dijalan lubang akan dikorek dalam anggaran 10 sehingga 15 mengikut yang ditetapkan dalam plan. backhoe akan digunakan untuk process excavation untuk pad footing.
once the marking work area is completed, excavation work will be carried out. during the process of excavation in the path of the pit will be excavated in an estimated 10 to 15 according to the plan. the backhoe will be used for process excavation for footing pads.
Last Update: 2021-12-28
Usage Frequency: 2
Quality:
Reference: