Results for cost overruns translation from Malay to English

Malay

Translate

cost overruns

Translate

English

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

Malay

English

Info

Malay

survey cost

English

survey cost

Last Update: 2020-03-14
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

cost of goods sale

English

Last Update: 2021-05-02
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

leaving cost zaman sekarang

English

the salary and benefits distributed by the company are not in line with today's

Last Update: 2024-07-03
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

can not be reduced due to cost up

English

can not be reduced because cost up

Last Update: 2019-03-13
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

all detail complete as requested except for construction cost.

English

construction cost

Last Update: 2020-07-09
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

how much is it going to cost me to buy my own house in malaysia?

English

can i etablish the business in penang

Last Update: 2020-01-17
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

soft skill seperti basic vehicle maintenance boleh mengelakkan kemalangan daripada terjadi dan mampu jimatkan duit dari segi repair cost

English

problem solving abilities and also critical thinking can help in difficult situations such as floods where locals live in darkness, lack of food and drink

Last Update: 2022-01-19
Usage Frequency: 1
Quality:

Reference: Anonymous

Malay

penterjemtranslatewith the issuance of perakuan bayaran penultimate no. 1 kepada pihak kontaktor (in april 2013), we have made a computation on the final consultancy fees as summarised below. the fees comprise the scale of fees for the cost of works (rm91,975,223.45) and r. c. portion (rm30,079,647.80). the details are given in the attachment of the letter. ahan

English

scheduled maintenance is a stitch-in-time procedure and incorporates

Last Update: 2013-07-10
Usage Frequency: 17
Quality:

Reference: Wikipedia

Get a better translation with
8,733,684,782 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK