From professional translators, enterprises, web pages and freely available translation repositories.
saluran paip air
water pipeline
Last Update: 2021-09-12
Usage Frequency: 1
Quality:
Reference:
saluran paip tersumbat
clogged drainage
Last Update: 2020-10-15
Usage Frequency: 1
Quality:
Reference:
paip
pipe
Last Update: 2014-08-20
Usage Frequency: 5
Quality:
Reference:
mata paip
with 1 flow
Last Update: 2021-12-22
Usage Frequency: 1
Quality:
Reference:
kepala paip
sink faucet head
Last Update: 2024-04-25
Usage Frequency: 2
Quality:
Reference:
paip rosak!
broken pipe!
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
_garis paip:
pipeli_ne:
Last Update: 2014-08-15
Usage Frequency: 1
Quality:
Reference:
caj untuk membaiki saluran paip bawah tanah bocor
charges for leaking underground pipelines
Last Update: 2021-09-09
Usage Frequency: 1
Quality:
Reference:
saluran paip gas biasanya terletak berhampiran dengan permukaan tanah
precautions steps for working near underground utility service
Last Update: 2023-02-27
Usage Frequency: 1
Quality:
Reference:
42 batang paip
42 pipes
Last Update: 2021-09-19
Usage Frequency: 1
Quality:
Reference:
kepala paip tercabut
dislodged pipe head
Last Update: 2022-06-02
Usage Frequency: 1
Quality:
Reference:
kerja-kerja paip
kuching sewer pipe network – property connection
Last Update: 2024-08-05
Usage Frequency: 1
Quality:
Reference:
seperti disarankan oleh pihak mmhe fast, saluran paip air di sinki atau tab boleh dibiarkan terbuka buat sementara waktu.
for information, the pipe repair process was carried out at mmhe dock no. 1 on 17/11/2020. sorry for the inconvenience if found dirty tap water this morning.
Last Update: 2020-11-18
Usage Frequency: 1
Quality:
Reference:
sekiranya saluran paip anda dipenuhi dengan daun, bangkai haiwan, atau benda lain, ia boleh menyekat aliran longkang dan mengakibatkan tandas tersumbat.
if your pipeline is filled with leaves, animal carcasses, or other objects, it can block the flow of the drain and result in clogged toilets.
Last Update: 2022-08-09
Usage Frequency: 1
Quality:
Reference:
untul makluman, proses pembaikkan saluran paip telah dijalankan di mmhe dock no. 1 pada 17/11/2020. minta maaf atas kesulitan jika mendapati air paip kotor pada pagi ini.
for information, the pipe repair process was carried out at mmhe dock no. 1 on 17/11/2020. sorry for the inconvenience if found dirty tap water this morning.
Last Update: 2020-11-18
Usage Frequency: 1
Quality:
Reference:
tujuan menentukan keperluan pembinaan awam termasuk penggalian, pengisian dan aktiviti bersekutu yang mematuhi dokumen kontrak, spesifikasi dan skop kerja serta lukisan/dokumen yang diluluskan. ia juga termasuk kerja tanah yang berkaitan dengan parit untuk saluran paip atau saluran perkhidmatan.
purpose to specify the requirements of civil construction including excavation, filling, and allied activities complying with the contract document, specification, and scope of work and approved drawings/documents. it also includes earthworks associated with trenches for pipelines or service ducts.
Last Update: 2023-09-12
Usage Frequency: 1
Quality:
Reference:
skope yang terakhir pula ialah, pelabuhan laut dan kemudahan pengendalian minyak (kemudahan yang menimbulkan risiko kejadian pencemaran minyak, termasuk, antara lain, pelabuhan laut, terminal minyak, saluran paip dan kemudahan pengendalian minyak yang lain).
the last scope is, seaports and oil handling facilities (facilities that pose a risk of oil pollution, including, inter alia, seaports, oil terminals, pipelines and other oil handling facilities).
Last Update: 2021-10-31
Usage Frequency: 1
Quality:
Reference: