From professional translators, enterprises, web pages and freely available translation repositories.
tiang
instructions by
Last Update: 2021-06-14
Usage Frequency: 1
Quality:
Reference:
tiang gol
tennis
Last Update: 2021-04-06
Usage Frequency: 1
Quality:
Reference:
rentis tnb
main switch station
Last Update: 2021-12-21
Usage Frequency: 1
Quality:
Reference:
mendirikan tiang elektric
erecting a pillar
Last Update: 2022-06-21
Usage Frequency: 1
Quality:
Reference:
menara atau tiang tumbang
fallen towers or pillars
Last Update: 2021-11-24
Usage Frequency: 1
Quality:
Reference:
menanam tiang papan tanda
signpost mounting
Last Update: 2022-08-04
Usage Frequency: 1
Quality:
Reference:
visi dan misi tnb
vision and mission tnb
Last Update: 2016-01-12
Usage Frequency: 1
Quality:
Reference:
gangguan tnb supply
gangguan bekalan elektrik
Last Update: 2020-10-26
Usage Frequency: 1
Quality:
Reference:
pengurusan dan pengurusan tnb
“to be among the leading corporations in energy and related businesses globally”
Last Update: 2015-11-18
Usage Frequency: 1
Quality:
Reference:
pencawang masuk utama tnb
pencawang masuk utama
Last Update: 2019-07-08
Usage Frequency: 1
Quality:
Reference:
sukacitanya dimaklumkan bahawa pihak tnb
we are pleased to inform you that
Last Update: 2024-03-29
Usage Frequency: 1
Quality:
Reference:
plan hitung pencawang elektrik tnb
tnb electric substation
Last Update: 2022-08-19
Usage Frequency: 1
Quality:
Reference:
tnb rangkul anugerah platinum global csr summit
tnb wins csr summit global platinum awards
Last Update: 2021-11-24
Usage Frequency: 1
Quality:
Reference:
lapor diri untuk latihan industri di tnb kuala berang
report yourself on duty
Last Update: 2020-02-26
Usage Frequency: 1
Quality:
Reference:
pihak tnb telah menyatakan bahawa bekalan elektrik mencukupi sehingga 110a
citcat translation
Last Update: 2022-04-06
Usage Frequency: 1
Quality:
Reference:
untuk bulan jan2021 terdapat 3 kali bekalan kuasa tnb mengalami gangguan
for jan2021 there are 3 times tnb power supply experiencing disorders
Last Update: 2021-02-04
Usage Frequency: 1
Quality:
Reference:
rujukan kami: tnb grid / gm / kl 14/13/1
our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________
Last Update: 2018-04-03
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting