From professional translators, enterprises, web pages and freely available translation repositories.
සොයන්න... @ info: progress
buscando... @info: progress
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
සටහන එක් කරන්න... @ info: progress
añadir comentario@info: progress
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
බහලුම් ගණිමින්:% 1@ info: progress
cantidad de carpetas: %1@info: progress
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
kde තේමා ස්ථාපනය කරමින්@ info: progress
instalando temas de kdm@info: progress
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
label for button to close search index progress dialog after successful completion
registro de la creación del índice: label for button to close search index progress dialog after successful completion
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
tooltip shown when the mouse is over the progress slider, representing the position in the currently playing track that amarok will seek to if you click the mouse. keep it concise.
0%
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
p, li {white- space: pre- wrap;} normal scheduling: default linux time- sharing (other) normal is the standard linux time- sharing scheduler that is intended for all processes that do not require special static priority real- time mechanisms. the process to run is chosen from the list of other normal or batch processes based on a dynamic priority that is determined only inside this list. the dynamic priority is based on the priority level given and increased for each time- quantum the process is ready to run, but denied to run by the scheduler. this ensures fair progress among all normal processes.
p, li {white-space: pre-wrap;} planificación normal: tiempo compartido predeterminado de linux (otro) normal es el planificador estándar de linux para todos los procesos que no necesitan mecanismos especiales de prioridad en tiempo real. el proceso a ejecuta se elige de la lista de otro normal o lote de procesos basado en prioridad dinámica determinada sólo en esta lista. la prioridad dinámica se basa en el nivel de prioridad dado y se incrementa para cada periodo de tiempo en el que el proceso está listo para ser ejecutado pero el planificador no lo ejecuta. esto asegura un progreso justo para los procesos normales.
Last Update: 2011-10-23
Usage Frequency: 1
Quality: