From professional translators, enterprises, web pages and freely available translation repositories.
jackknife variance estimation with survey data under hot deck imputation.
jackknife variance estimation with survey data under hot deck imputation.
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
"the cocomo 2.0 software cost estimation model," international society of parametric analysis (may 1995).
"the cocomo 2.0 software cost estimation model," international society of parametric analysis (may 1995).
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Warning: Contains invisible HTML formatting
== enlaces externos ==* the cocomo 2.0 software cost estimation model* the nasa software engineering laboratory: manager's handbook for software development* the nasa software engineering laboratory: manager's handbook for software development* reduced graphic of the cone of uncertainty on microsoft.com* explanation of cone of uncertainty from construx - software development best practices* the cone of uncertainty and hurricane forecasting
== external links ==* the cocomo 2.0 software cost estimation model* the nasa software engineering laboratory: manager's handbook for software development* the nasa software engineering laboratory: manager's handbook for software development* reduced graphic of the cone of uncertainty on microsoft.com* explanation of cone of uncertainty from construx - software development best practices* the cone of uncertainty and hurricane forecasting
Last Update: 2016-03-03
Usage Frequency: 1
Quality:
Some human translations with low relevance have been hidden.
Show low-relevance results.