Usted buscó: reviewed by (Inglés - Malayo)

Traducción automática

Aprendiendo a traducir con los ejemplos de traducciones humanas.

English

Malay

Información

English

reviewed by

Malay

 

De: Traducción automática
Sugiera una traducción mejor
Calidad:

Contribuciones humanas

De traductores profesionales, empresas, páginas web y repositorios de traducción de libre uso.

Añadir una traducción

Inglés

Malayo

Información

Inglés

was reviewed by

Malayo

telah disemak pada

Última actualización: 2023-06-08
Frecuencia de uso: 2
Calidad:

Inglés

please complete the correction details and have been reviewed by the supervisor to be forwarded to the first assessor

Malayo

sila lengkapkan butiran pembetulan dan telah disemak oleh penyelia untuk dimajukan kepada penilai pertama

Última actualización: 2020-05-29
Frecuencia de uso: 1
Calidad:

Referencia: Anónimo

Inglés

document reference, all alerts, date of power of attorney, date of update, billing. cover, prepared by, reviewed by, endorsed by

Malayo

rujukan dokumen, makluman semua, tarikh kuatkuasa, tarikh kemaskini, bil. muka surat, disediakan oleh, disemak oleh, disahkan oleh

Última actualización: 2022-05-13
Frecuencia de uso: 3
Calidad:

Referencia: Anónimo

Inglés

our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________

Malayo

rujukan kami: tnb grid / gm / kl 14/13/1

Última actualización: 2018-04-03
Frecuencia de uso: 1
Calidad:

Referencia: Anónimo
Advertencia: contiene formato HTML invisible

Obtenga una traducción de calidad con
7,794,790,707 contribuciones humanas

Usuarios que están solicitando ayuda en este momento:



Utilizamos cookies para mejorar nuestros servicios. Al continuar navegando está aceptando su uso. Más información. De acuerdo