Je was op zoek naar: reviewed by (Engels - Maleis)

Computervertaling

Via de voorbeelden van menselijke vertaling trachten te leren vertalen.

English

Malay

Info

English

reviewed by

Malay

 

Van: Machinevertaling
Stel een betere vertaling voor
Kwaliteit:

Menselijke bijdragen

Van professionele vertalers, bedrijven, webpagina's en gratis beschikbare vertaalbronnen.

Voeg een vertaling toe

Engels

Maleis

Info

Engels

was reviewed by

Maleis

telah disemak pada

Laatste Update: 2023-06-08
Gebruiksfrequentie: 2
Kwaliteit:

Engels

please complete the correction details and have been reviewed by the supervisor to be forwarded to the first assessor

Maleis

sila lengkapkan butiran pembetulan dan telah disemak oleh penyelia untuk dimajukan kepada penilai pertama

Laatste Update: 2020-05-29
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

document reference, all alerts, date of power of attorney, date of update, billing. cover, prepared by, reviewed by, endorsed by

Maleis

rujukan dokumen, makluman semua, tarikh kuatkuasa, tarikh kemaskini, bil. muka surat, disediakan oleh, disemak oleh, disahkan oleh

Laatste Update: 2022-05-13
Gebruiksfrequentie: 3
Kwaliteit:

Referentie: Anoniem

Engels

our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________

Maleis

rujukan kami: tnb grid / gm / kl 14/13/1

Laatste Update: 2018-04-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Krijg een betere vertaling met
8,038,721,469 menselijke bijdragen

Gebruikers vragen nu voor assistentie



Wij gebruiken cookies om u de best mogelijke ervaring op onze website te bieden. Door de website verder te gebruiken, geeft u toestemming voor het gebruik van cookies. Klik hier voor meer informatie. OK