Réalisées par des traducteurs professionnels, des entreprises, des pages web ou traductions disponibles gratuitement.
wob and higher rpms for faster drilling.
construidas para soportar las crecientes demandas de energía del wob y las altas rpms para más rápida perforación.
Dernière mise à jour : 2018-02-13
Fréquence d'utilisation : 1
Qualité :
duelast survey at 1410 ft, 29.52º incl , 225.50º azm and last geology sample 60% clsst, 30% sst, 10 % sd. last survey at 1410 ft, 29.52º incl , 225.50º azm and last geology sample 60% clsst, 30% sst, 10 % sd. last survey at 1410 ft, 29.52º incl , 225.50º azm and last geology sample 60% clsst, 30% sst, 10 % sd. last survey at 1410 ft, 29.52º incl , 225.50º azm and last geology sample 60% clsst, 30% sst, 10 % sd. stop drilling due gas ( max gas unit: 2436 ) and mud in 9.7 & out 9.3ppg . circulate 300 gpm - 520 psi and increase mud weith to 9.8 ppg in & out and reduce gas unit. stop gas inyection on lo6-22d. drilling in rotate mode fr/ 1682 ft to 1740 with wob: 22/25 klbs, 750 gpm - 2426 psi, 40 rpm , torq 3/5 klb-ft. mw: 9.8 ppg - gas background: 200 unit
due