검색어: trakhees (영어 - 아랍어)

인적 기여

전문 번역가, 번역 회사, 웹 페이지 및 자유롭게 사용할 수 있는 번역 저장소 등을 활용합니다.

번역 추가

영어

아랍어

정보

영어

trakhees

아랍어

ترخيص

마지막 업데이트: 2018-12-31
사용 빈도: 1
품질:

추천인: 익명

영어

1.0 definitions: unless defined elsewhere herein or defined in the conditions of the contract, capitalised terms used in this employer’s requirements shall have the meaning ascribed to them hereunder. “berth” shall mean the facilities at existing berths at jafza “battery limit” shall mean the physical limit for scope of works to be carried out by the contractor. 2.0 location emirates national oil company llc (hereinafter referred to interchangeably as “enoc” or the “employer”) owns and operates various facilities at jebel ali, dubai. the locations of the site include enoc facilities, jafza & dp world corridors, public road crossings, dugas, epcl, dwc and common services corridor, berth area etc inside jebel ali free zone. 3.0 governing conditions / specification and drawings the contractor shall execute the works on an engineering, procurement and construction basis. the works shall be carried out in accordance with the terms of the contract. contractor undertakes to follow and comply with safety precautions set by the employer, dp world, jafza, trakhees, civil defence, all relevant local authorities, all relevant applicable laws of united arab emirates including best industry practices and safety guidelines. 4.0 the works 4.1 project description enoc intends to provide a backup pipeline for fire water supply to dugas, eil, emgas and epcl (ex- dusup). existing fire water supply to dugas, eil, emgas, hejp and eil is through a single pipeline from dugas fire water pumps. incase of a fire in dugas, other facilities eil, emgas, hejp will be unprotected and is a high risk. proposed pipeline will provide a backup fire water supply in such a scenario from epcl fire water pumps protecting emgas, eil and epcl (ex- dusup). this will ensure that an alternate fire water source is available and ensure integrity of the business asset. the project objective is to design, build and commission backup pipeline for existing firewater supply to dugas, emgas, epcl (ex- dusup) and eil terminals 1 and 2. 4.2 scope of works a. contractor shall carry out the design, detail engineering, obtaining all permits, noc’s, approvals, local authorities’ clearances including preparation of all design, drawings / documents, engaging local authority approved consultant and sub-contractors for obtaining all approvals related to the project design and execution, procurement & supply of all materials, tools, consumables, maintenance & material handling equipment, testing & inspection equipment and personnel, working crew/labour, transport, site offices, rest room & other facilities for contractor’s / employer’s representative & employer’s personnel, supervision, fabrication, transportation of materials including free issue items if any, construction, installation, testing, painting, coating, engage & obtain third party inspection/ certifications, calibration, mechanical completion, pre-commissioning and provide overall management of the site including assistance for facility commissioning by employer.

아랍어

1.0 التعريفات: ما لم يتم تعريفها في مكان آخر في هذه الوثيقة أو في شروط العقد ، فإن المصطلحات المكتوبة بحروف كبيرة المستخدمة في متطلبات صاحب العمل هذا يكون لها المعنى المسند إليها أدناه. "المرسى" يعني المرافق الموجودة في المراسي الموجودة في جفزة "حد البطارية" يعني الحد المادي لنطاق الأعمال التي يتعين على المقاول تنفيذها. 2.0 الموقع شركة نفط الإمارات الوطنية ذ.م. م (يشار إليها فيما يلي بالتبادل باسم "enoc" أو "صاحب العمل ")

마지막 업데이트: 2022-03-21
사용 빈도: 1
품질:

추천인: 익명
경고: 보이지 않는 HTML 형식이 포함되어 있습니다

인적 기여로
7,776,985,869 더 나은 번역을 얻을 수 있습니다

사용자가 도움을 필요로 합니다:



당사는 사용자 경험을 향상시키기 위해 쿠키를 사용합니다. 귀하께서 본 사이트를 계속 방문하시는 것은 당사의 쿠키 사용에 동의하시는 것으로 간주됩니다. 자세히 보기. 확인