Je was op zoek naar: that was the day we met for the first time (Engels - Tamil)

Computervertaling

Via de voorbeelden van menselijke vertaling trachten te leren vertalen.

English

Tamil

Info

English

that was the day we met for the first time

Tamil

 

Van: Machinevertaling
Stel een betere vertaling voor
Kwaliteit:

Menselijke bijdragen

Van professionele vertalers, bedrijven, webpagina's en gratis beschikbare vertaalbronnen.

Voeg een vertaling toe

Engels

Tamil

Info

Engels

how did you meet sudhar for the first time?

Tamil

சுதாரின் வாழ்க்கையில் ஒரு விஷயத்தை நீங்கள் சேர்க்க முடிந்தால், அது என்னவாக இருக்கும்?

Laatste Update: 2022-05-08
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

for the first time we did thunder bearing fitting work

Tamil

முதல் முறை இடி தாங்கி பொறுத்தும் வேலை செய்தோம்

Laatste Update: 2020-11-05
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

he it is who creates for the first time and he it is who will create again,

Tamil

நிச்சயமாக, அவனே ஆதியில் உற்பத்தி செய்தான், மேலும் (மரணத்தற்குப் பின்னும்) மீள வைக்கிறான்.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

my heart found peace, as i fell in love with you, and it’s all happened for the first time.

Tamil

நான் உன்னை காதலித்ததால் என் இதயம் அமைதியைக் கண்டது, இது எல்லாம் முதல் முறையாக நடந்தது.

Laatste Update: 2021-08-29
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

and we shall turn aside their hearts and their eyesights, even as they believed not therein for the first time and we shall let them wander in their exorbitance perplexed.

Tamil

மேலும், நாம் அவர்களுடைய உள்ளங்களையும் அவர்களுடைய பார்வைகளையும் திருப்பிவிடுவோம் - அவர்கள் முதலில் இதை நம்பாமல் இருந்தது போலவே இன்னும் அவர்கள் தங்களுடைய வழி கேட்டிலேயே தட்டழிந்து திரியுமாறு அவர்களை நாம் விட்டுவிடுவோம்.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

say thou:" he shall quicken them who brought them forth for the first time, and he is of every kind of creation the knower!

Tamil

"முதல் முதலில் அவற்றை உண்டு பண்ணியவனே (பின்னும்) அவற்றுக்கு உயிர் கொடுப்பான். அவன் எல்லாவகைப் படைப்புகளையும் நன்கறிந்தவன்" என்று (நபியே!) நீர் கூறுவீராக!

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

say, "he will give them life who created them for the first time! for he is well-versed in every kind of creation!-

Tamil

"முதல் முதலில் அவற்றை உண்டு பண்ணியவனே (பின்னும்) அவற்றுக்கு உயிர் கொடுப்பான். அவன் எல்லாவகைப் படைப்புகளையும் நன்கறிந்தவன்" என்று (நபியே!) நீர் கூறுவீராக!

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

(this will happen) on the day when we roll up the heavens as if it were a written scroll and bring it back into existence just as though we had created it for the first time. this is what we have promised and we have always been true to our promise.

Tamil

எழுதப்பட்ட ஏடுகளைச் சருட்டுவதைப் போல் வானத்தை நாம் சுருட்டிவிடும் அந்நாளை (நபியே! நினைவூட்டுவீராக!); முதலில் படைப்புகளைப் படைத்தது போன்றே, (அந்நாளில்) அதனை மீட்டுவோம்; இது நம் மீது வாக்குறுதியாகும்; நிச்சயமாக நாம் இதனை செய்வோம்.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

on the day when we shall roll up heaven as a scroll is rolled for the writings; as we originated the first creation, so we shall bring it back again -- a promise binding on us; so we shall do.

Tamil

எழுதப்பட்ட ஏடுகளைச் சருட்டுவதைப் போல் வானத்தை நாம் சுருட்டிவிடும் அந்நாளை (நபியே! நினைவூட்டுவீராக!); முதலில் படைப்புகளைப் படைத்தது போன்றே, (அந்நாளில்) அதனை மீட்டுவோம்; இது நம் மீது வாக்குறுதியாகும்; நிச்சயமாக நாம் இதனை செய்வோம்.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

and ask thou them concerning the town that was close on the sea, when they transgressed in the matter of the sabt, when their fish came unto them openly on their sabt day, while they came not on the day whereon they kept not we proved them for the sabt. thus they were wont to transgress.

Tamil

(நபியே!) கடற்கரையிலிருந்த (ஓர்) ஊர் மக்களைப்பற்றி நீர் அவர்களைக் கேளும் - அவர்கள் (தடுக்கப்பட்ட ஸப்து) சனிக்கிழமையன்று வரம்பை மீறி (மீன் வேட்டையாடி)க் கொண்டிருந்தார்கள்; ஏனென்றால் அவர்களுடைய சனிக்கிழமையன்று (கடல்) மீன்கள், அவர்களுக்கு(த் தண்ணீருக்கு மேலே தலைகளை வெளியாக்கி)க் கொண்டு வந்தன - ஆனால் சனிக்கிழமையல்லாத நாட்களில் அவர்களிடம் (அவ்வாறு வெளியாக்கி) வருவதில்லை - அவர்கள் செய்து கொண்டிருந்த பாவத்தின் காரணமாக அவர்களை நாம் இவ்வாறு சோதனைக் குள்ளாக்கினோம்.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

and everyone shall be presented before your lord in rows; “indeed you have come to us exactly as we had created you for the first time – in fact you thought that we shall never appoint a promised time for you!”

Tamil

அவர்கள் யாவரும் உம்முடைய இறைவனின் சமூகத்தில் வரிசையாகக் கொண்டு வரப்படுவார்கள்; "நாம் உங்களை முதல் தடவை படைத்தவாறே திட்டமாக இப்பொழுதும் நீங்கள் நம்மிடம் வந்து விட்டீர்கள், ஆனால் நாம் உங்களுக்காக வாக்களிக்கப்பட்ட இத்தகைய நாளை ஏற்படுத்த மாட்டோம் என்று நீங்கள் எண்ணிக் கொண்டிருந்தீர்கள்" (என்று சொல்லப்படும்).

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

but they belied him, so the torment of the day of shadow (a gloomy cloud) seized them, indeed that was the torment of a great day.

Tamil

நிச்சயமாக இதிலே ஓர் அத்தாட்சி இருக்கிறது எனினும் அவர்களில் பெரும்பாலோர் நம்பிக்கை கொள்வதில்லை.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

say: (o muhammad saw) "he will give life to them who created them for the first time! and he is the all-knower of every creation!"

Tamil

"முதல் முதலில் அவற்றை உண்டு பண்ணியவனே (பின்னும்) அவற்றுக்கு உயிர் கொடுப்பான். அவன் எல்லாவகைப் படைப்புகளையும் நன்கறிந்தவன்" என்று (நபியே!) நீர் கூறுவீராக!

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

and now ye are come unto us singly even as we had created you for the first time, and ye have left behind your backs that which we had granted unto you, and we see not along with you your intercessors who ye fancied were our associates in respect of you as ye asserted. now are the ties betwixt you severed and strayed from you is that which ye were wont to assert.

Tamil

அன்றியும் (மறுமையில் அல்லாஹ் இவர்களை நோக்கி), "நாம் உங்களை முதல் முறையாகப் படைத்தோமே அதுபோன்று நீங்கள் (எதுவுமில்லாமல்) தனியே எம்மிடம் வந்துவிட்டீர்கள்; இன்னும்; நாம் உங்களுக்கு அளித்தவற்றையெல்லாம் உங்கள் முதுகுகளுக்குப் பின்னால் விட்டு விட்டீர்கள்; எவர்களை நீங்கள் உங்களுடைய கூட்டாளிகள் என்று எண்ணிக் கொண்டிருந்தீர்களோ, உங்களுக்குப் பரிந்து பேசுவார்கள் (என்று எண்ணிக் கொண்டிருந்தீர்களோ) அவர்களை நாம் உங்களுடனிருப்பதைக் காணவில்லை, உங்களுக்கிடையே இருந்த தொடர்பும் அறுந்து விட்டது, உங்களுடைய நம்பிக்கைகள் எல்லாம் தவறிவிட்டன" (என்று கூறுவான்).

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

mahatma gandhi: the father of the nation mahatma gandhi was the great leader of the freedom movement. ... pandit jawaharlal nehru: pandit jawaharlal nehru was one of the great leaders who gave up everything and fought for the freedom of india. he was the first prime minister of india after india got independence

Tamil

மகாத்மா காந்தி: தேசத்தின் தந்தை மகாத்மா காந்தி சுதந்திர இயக்கத்தின் சிறந்த தலைவராக இருந்தார். ... பண்டிட் ஜவஹர்லால் நேரு: பண்டிட் ஜவஹர்லால் நேரு எல்லாவற்றையும் கைவிட்டு இந்திய சுதந்திரத்திற்காக போராடிய சிறந்த தலைவர்களில் ஒருவர். இந்தியாவுக்கு சுதந்திரம் கிடைத்த பிறகு இந்தியாவின் முதல் பிரதமர் ஆவார்

Laatste Update: 2020-09-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

the day we shall roll up the heaven, like rolling of the scrolls [meant] for writings. we will bring it back just as we began the first creation—a promise [binding] on us. [that] indeed we will do.

Tamil

எழுதப்பட்ட ஏடுகளைச் சருட்டுவதைப் போல் வானத்தை நாம் சுருட்டிவிடும் அந்நாளை (நபியே! நினைவூட்டுவீராக!); முதலில் படைப்புகளைப் படைத்தது போன்றே, (அந்நாளில்) அதனை மீட்டுவோம்; இது நம் மீது வாக்குறுதியாகும்; நிச்சயமாக நாம் இதனை செய்வோம்.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

the first house to be built for mankind was the one at bakkah [makkah]. it is a blessed place; a source of guidance for the whole world.

Tamil

(இறை வணக்கத்திற்கென) மனிதர்களுக்காக வைக்கப் பெற்ற முதல் வீடு நிச்சயமாக பக்காவில் (மக்காவில்) உள்ளதுதான். அது பரக்கத்து (பாக்கியம்) மிக்கதாகவும், உலக மக்கள் யாவருக்கும் நேர்வழியாகவும் இருக்கிறது.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem

Engels

proclaim (o dear prophet mohammed – peace and blessings be upon him), “travel in the land and see how he creates for the first time, then allah brings forth the next development; indeed allah is able to do all things.”

Tamil

"பூமியில் நீங்கள் பிரயாணம் செய்து, அல்லாஹ் எவ்வாறு (முந்திய) படைப்பைத் துவங்கிப் பின்னர் பிந்திய படைப்பை எவ்வாறு உண்டு பண்ணுகிறான் என்பதைப் பாருங்கள்; நிச்சயமாக அல்லாஹ் எல்லாப் பொருட்கள் மீதும் பேராற்றலுள்ளவன்" என்று (நபியே!) நீர் கூறுவீராக.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

then if allah takes you back to a group of them and they seek permission from you to go out to fight, say to them, “you shall never go out with me nor ever fight with me against any enemy; you were happy to remain seated for the first time, therefore remain seated with those who stay behind.”

Tamil

(நபியே!) உம்மை அல்லாஹ் அவர்களில் ஒரு கூட்டத்தாரிடம் திரும்பி வருமாறு செய்து (உம் வெற்றியையும், பொருட்களையும் பார்த்துவிட்டு மறு யுத்தத்திற்குப்) புறப்பட்டு வர உம்மிடம் அனுமதி கோரினால், நீர் அவர்களிடம் "நீங்கள் ஒருக்காலும் என்னுடன் புறப்படாதீர்கள்; இன்னும் என்னுடன் சேர்ந்து எந்ந விரோதியுடனும் நீங்கள் போர் செய்யாதீர்கள். ஏனெனில் நீங்கள் முதன் முறையில் (போருக்குப் புறப்படாமல் தன் வீடுகளில்) உட்கார்ந்திருப்பதைத் தான் பொருத்தமெனக்கொண்டீர்கள் - எனவே (இப்பொழுதும் தம் இல்லங்களில்) தங்கியவர்களுடனேயே இருந்து விடுங்கள்" என்று கூறுவீராக!.

Laatste Update: 2014-07-03
Gebruiksfrequentie: 1
Kwaliteit:

Referentie: Anoniem
Waarschuwing: Bevat onzichtbare HTML-opmaak

Engels

contract to build a house at i. contract parties now comes (builder’s name) of (address) and (buyer’s name) of (address) to hereby agree to build a house on property located at (common address) and legally described as (insert legal description here.) . ii. contract documents the terms of this contract include all the documents specifically listed below, and constitute the entire terms of the agreement between the parties. the terms of this contract shall prevail over any conflicting provision in the documents incorporated by reference. 1. architectural plans and drawings dated with number of pages is hereby incorporated into this document. 2. specifications dated with number of pages is hereby incorporated into this document. 3. schedule of allowance items dated with number of pages is hereby incorporated into this document. 4. title of document – add any documents not included in the previous samples, delete any of the previous samples no longer needed dated with number of pages is hereby incorporated into this document. iii. building plans first option: use when the plans are supplied by the buyers the builder agrees to construct the home in accordance with the plans, including specifications and drawings, supplied by the buyer and incorporated by reference into paragraph ii. contract documents. the builder assumes no responsibility or liability for defects in the design or engineering in these plans. the buyer represents to the builder that the buyer is the sole owner of the plans or has the legal right to use the plans. the buyer agrees to indemnify and hold the builder harmless for any copyright action which may be asserted as a result of the use of the plans. the buyer warrants that the plans are adequate and that the builder can rely on them. the buyer will be liable for any damages caused by defects in the plans, including, but not limited to, additional material costs, additional labor costs, pro rata overhead and profit. second option: use when the plans are supplied by the builder the builder has provided the plans, specifications and drawings which are incorporated by reference into paragraph ii. contract documents, and which are to be used for the construction of the house. the builder makes no representation about the quality of these plans beyond those specifically provided in the warranties clause of this contract. iv. completion time assuming all conditions are satisfied and weather permits, the work to be performed under the contract shall be substantially completed no later than days after the work commences. the work shall commence within days after the permits necessary to start work have been issued, the buyer has supplied the builder with a written notice of financing as described in paragraph v. financing, and the buyer shall have supplied the builder with a correct statement of the recorded legal title of the property and the buyer’s interest in the property. any time lost by reason of changes to the contract or changes in plans by the buyer, other acts of the buyer, strikes, weather conditions not reasonably anticipated, or any other condition not within the builder’s control shall be added to the specified time for completion. for any delays which are not the builder’s responsibility, the contract price shall increase by any increase in the builder’s costs caused by the delay. a claim for an increase in time for the performance of the contract, or an increase in the contract cost shall be made within days after the builder first recognizes the condition giving rise to the claim. v. financing this contract is contingent upon the buyer obtaining a construction loan in the amount of $ dollars. all fees and expenses of obtaining a loan shall be borne by the buyer. the builder is not required to begin construction until the buyer provides the builder with written notice from the lender confirming the loan. vi. contract price first option: fixed price contract the buyer agrees to pay a total price of $ dollars to the builder for construction of the house, and the builder agrees to provide all the labor, materials, equipment, tools, and other services necessary to construct the house. upon the signing of this contract, the buyer agrees to pay $ dollars to the builder as a deposit. the buyer will make the following interim payments: (list the amounts and number of the progress payments and what triggers them: for example, specific dates such as the first monday of every month; or the start or the completion of specific construction events.) the buyer agrees to make a final payment in the amount of $ within days of the buyer’s final inspection and acceptance of the property (alternative language, such as: “within days after substantial completion”). the buyer is not entitled to possession until after final payment. second option: cost plus fee the builder agrees to construct the house according to the plans. as consideration for the builder constructing the house, the buyer agrees to pay the builder’s full costs and expenses, plus a fixed fee of $ dollars. upon signing the documents, the buyer will pay $ dollars as a deposit. each (at the end of the week or month) the builder shall prepare for the buyer itemized statements of the costs and expenses incurred to date. the buyer will make a regular payment to the builder on (a regular recurring date such as the first monday of each week) of the builder’s unpaid costs and expenses as stated in the most recent itemized statement. the builder’s costs and expenses include the following: all gross wages, employment benefits, costs of workers’ compensation, and unemployment insurance incurred by the builder as the cost of labor during the performance of this contract, plus all salaries for builder’s employees, but only to the extent that their time is spent on work required by this contract; the cost of all materials, supplies, and equipment consumed in this project, including the cost of delivery and transportation of materials; rental charges consistent with those prevailing in the area for the use of machinery and equipment used at the construction site, whether owned by the builder or by others; all land costs associated with building this house, which are paid by the builder; all payments made by the builder for work performed according to subcontracts under this agreement; all costs incurred for safety and security at the job site; all costs incurred for building and code compliance; all landscaping and backfilling costs necessary under the contract documents; all builder’s risk and other insurance costs necessary under the contract documents; all soil fees and civil engineering fees necessary for this building project; all costs associated with differing site conditions. a differing site condition is a physical characteristic of the property that materially changes the construction techniques from those reasonably expected at the time of the contract. the buyer shall also pay to the builder a salary or hourly rate of $ for the builder’s actual hours spent on supervision of the construction of this house. the buyer will make a final payment of all amounts still owing within days of the buyer’s final inspection and acceptance of the property (alternative language, such as: “within days after substantial completion”). the buyer is not entitled to possession until after final payment. vii. allowance items upon signing this contract, the buyer shall be given the selection guide that is incorporated by reference into paragraph ii. contract documents to help the buyer select allowance items, materials, and colors that will be required during the construction process. exterior selections must be made within days of signing this contract. interior selections must be made within days of signing this contract. viii. late payments payments not made in a timely fashion shall incur daily interest at the rate of % from the day the payment is due. if the buyer fails to pay the builder within seven days of the date the payment is due, through no fault of the builder, the builder may stop work and may keep the job idle until such time as payments that are due to the builder are paid. if the builder chooses not to stop work after a payment delay, this is not to be construed as a waiver of his rights to stop work if future payments are delayed. all attorney fees incurred by the builder to collect sums owed by the buyer shall be paid by the buyer, together with interest at the rate of %. ix. permits and surveys the buyer shall obtain and furnish all necessary surveys describing the physical characteristics of the property, the location of all utilities, and the location of all easements to the building that are necessary to allow the builder to complete his performance. if additional easements are necessary to complete the work, the buyer shall obtain those easements promptly. if no soil report is available, the buyer shall provide one at his own expense. the builder shall obtain building permits, licenses, building inspections and approvals required by local law. if a covenant or architectural review committee requires the approval of plans and specifications, the buyer shall be responsible for obtaining these approvals and paying for any fees connected with them. x. change orders the buyer may order changes in the work within the terms of this contract, but only by a prior written order and agreement with the builder that states the changes to the contract, the amount of any additional cost, and the additional number of days to be added to the contract completion date. any of the buyers may sign the change order and that signature will be binding upon all of the buyers. the buyers hereby agree to make all requests for change orders to the builder, and not to issue instructions to, or otherwise negotiate for additional or changed work specifications with, the builder’s employees or subcontractors. xi. insurance and risk management the builder shall obtain all workers’ compensation, commercial general liability insurance and comprehensive liability insurance necessary to protect builder from claims for damages due to bodily injury, including death, and for damages to property that may arise out of and during operations under this contract. the buyer shall purchase his own liability insurance including fire and casualty insurance to the full insurable value of the house and shall name the builder as an additional insured. each party shall issue a certificate of insurance to the other prior to the commencement of construction. xii. access to the property site the buyer shall have access to the property and the right to inspect the work in the presence of the builder. if the buyer enters the property during the course of construction without the permission of the builder, he does so at his own risk, and the buyer hereby releases the builder and does hereby hold the builder harmless from any and all claims for injury or damage to his person or property, and to the person or property of any person accompanying the buyer. xiii. inspection, acceptance, final payment and possession at the final inspection, the buyer will give the builder a signed and dated list that identifies any alleged deficiencies in the quality of the work or materials. the builder shall correct any items on the buyer’s list that are, in the good faith judgment of the builder, deficient in the quality of the work and/or materials according to the standards of construction in the area in which the house is built. the builder shall correct those defects within a reasonable period of time. after the defects have been corrected according to the standards of construction in the area in which the house is built, the buyer shall sign a certificate of acceptance acknowledging that the defects on the buyer's list have been corrected according to the standards of this contract. the builder shall provide the buyer with an affidavit stating that all materials and services for which a lien could be filed have been paid, or an affidavit identifying what services and materials for which a lien could be filed have not been paid, and swearing that such amounts will be paid from the proceeds of the final payment. (some states give the property owners the right to withhold amounts for unpaid potential lienholders, and make those payments directly to those potential lienholders.) occupancy will be granted to the buyer when the buyer makes a final inspection of the home, signs a certificate of acceptance, and makes the final payment. xiv. warranties all warranties are limited to the implied warranties of habitability and workmanlike construction and are limited to a period of one year from the date of the issuance of a certificate of occupancy by the local building code enforcement authority. this limited warranty is the only express warranty provided by the builder. xv. disputes should any dispute arise relative to the performance of this contract that the parties cannot resolve, the dispute shall be referred to a single arbitrator acceptable to the builder and the buyer. if the builder and the buyer cannot agree upon an arbitrator, the dispute shall be referred to the american arbitration association for resolution. all attorney fees that shall be incurred in the resolution of disputes shall be the responsibility of the party not prevailing in the dispute. xvi. the governing law and assignment this contract will be construed, interpreted, and applied according to the law of the state where the property is located. this contract shall not be assigned without the written consent of all parties. xvii. effective date and signature this contract shall become effective on the date it is signed by both parties. we, the undersigned, have read, understood, and agree to each of the provisions of this contract and hereby acknowledge receipt of a copy of this contract. by: (builder’s name) on behalf of (builder’s company name) title: date: by: (buyer) date: by: (buyer) date: attached contract documents: final contract 1. plans and specifications 2. allowance schedule (describe and include any other documents that have been incorporated by reference into the contract.)

Tamil

கட்டிட ஒப்பந்த உடன்பாடு

Laatste Update: 2015-11-08
Gebruiksfrequentie: 8
Kwaliteit:

Referentie: Anoniem

Krijg een betere vertaling met
7,794,191,560 menselijke bijdragen

Gebruikers vragen nu voor assistentie



Wij gebruiken cookies om u de best mogelijke ervaring op onze website te bieden. Door de website verder te gebruiken, geeft u toestemming voor het gebruik van cookies. Klik hier voor meer informatie. OK