A partir de tradutores profissionais, empresas, páginas da web e repositórios de traduções disponíveis gratuitamente
as you know from the 2007 selection , buyer has introduced a penalty scheme for any delay and probably any deviation in colour / quality from the approved sample
Última atualização: 2020-12-09
Frequência de uso: 1
Qualidade:
Referência:
some of epc’s significant projects are the development plan for ahmedabad (2002), development plan and town planning schemes for the reconstruction of bhuj, kachchh after the earthquake of 2001 and reformulating planning legislation for delhi. in 1998, unchs global 100 best practices award commended epc for its revitalization plan for surat’s inner city. in 2003 epc’s work on the sabarmati riverfront development project won the prime minister’s award for excellence in urban design and planning.[19][20][21][22][23]
[19][20][21][22][23]
Última atualização: 2021-04-10
Frequência de uso: 1
Qualidade:
Referência:
Algumas traduções humanas com pouca relevância foram ocultadas.
Mostrar resultados de pouca relevância.