Şunu aradınız:: my name is sujan (Japonca - Nepalce)

Bilgisayar çevirisi

İnsan çevirisi örneklerinden çeviri yapmayı öğrenmeye çalışıyor.

Japanese

Nepali

Bilgi

Japanese

my name is sujan

Nepali

 

Kimden: Makine Çevirisi
Daha iyi bir çeviri öner
Kalite:

İnsan katkıları

Profesyonel çevirmenler, işletmeler, web sayfaları ve erişimin serbest olduğu çeviri havuzlarından.

Çeviri ekle

Japonca

Nepalce

Bilgi

Japonca

フォルダを追加the name is not known

Nepalce

फोल्डर

Son Güncelleme: 2011-10-23
Kullanım Sıklığı: 1
Kalite:

Japonca

タイプdefault player name is "player "+ player number

Nepalce

प्रकार

Son Güncelleme: 2011-10-23
Kullanım Sıklığı: 1
Kalite:

Uyarı: Görünmez HTML biçimlendirmesi içeriyor

Japonca

factory in the working procedure specifications enactment date 2014.11.05 date of revision "rectify the defect work" all work must be done correctly based on the manual procedures. superiors of each work, for all of the following items, when the following things are not observed the interrupt the work and must be carried out to improve. (workers not protect the improvement instructions, do not allow the implementation of the work until follow the instructions.) 1. the dress of for you '(1) work clothes to wear ordained. '(2) i and hat worn for safety. however, at the time of lift and crane driving me to wear a helmet. '(3) i wear safety shoes. '(4) gloves, to wear to fit in work such as kawate, work gloves, vinyl gloves. when handling the machine that rotates such as drilling machine, lathe, to prohibit the use of gloves. '(5) during welding work, i wear a welding surface and dust mask. '(6) at the grinder or sander used, i wear protective glasses. '(7) the operator uses the combined protection that may be required, such as ear plugs on the application, i take measures not to impair their health. 2. maintenance of the plant '(1) we will endeavor to organize the working range, to improve the efficiency of work. '(2) around the workplace to confirm that there are no oil stains or waterlogged, are removed. '(3) for the passage secured, and not place objects block the passage. also in front of a fire hydrant and alarm i do not place any objects. '(4) machinery and measurement equipment, to manage by routine inspection table. 3. work procedure '(1) i will ensure implementation of the bar code input of time and attendance. also, because of input mistakes prevention, i make sure that the name is displayed on the computer screen. '(2) by radio gymnastics relaxes the body, is poised to be able to work immediately. '(3) due to the morning meeting, hirurei or manager instructions, i understand the process and the work. '(4) the specific content of each work procedure, refer to the related documents below. related documents: quality manual mechanical work procedure specifications, welding procedure specifications work, painting work procedures manual, sheet metal work procedures manual, assembly work procedures manual, electrical wiring manual procedures, inspection work procedures manual 4. after the work is completed '(1), such as tools and measurement equipment used and returned to the storage location. 'and (2) do not use the machine, turn off the power. '(3) such as sawdust, oil that came out during the work i clean. '(4) tools that use electricity, not leave plugged the outlet. '(5) such as air conditioning, stove, care is taken to off forgotten of power.

Nepalce

इंद्रधनुष

Son Güncelleme: 2014-11-23
Kullanım Sıklığı: 1
Kalite:

Referans: Anonim
Uyarı: Görünmez HTML biçimlendirmesi içeriyor

Daha iyi çeviri için
8,024,018,470 insan katkısından yararlanın

Kullanıcılar yardım istiyor:



Deneyiminizi iyileştirmek için çerezleri kullanıyoruz. Bu siteyi ziyaret etmeye devam ederek çerezleri kullanmamızı kabul etmiş oluyorsunuz. Daha fazla bilgi edinin. Tamam