İnsan çevirisi örneklerinden çeviri yapmayı öğrenmeye çalışıyor.
Profesyonel çevirmenler, işletmeler, web sayfaları ve erişimin serbest olduğu çeviri havuzlarından.
maksud contractor
meaning contractor
Son Güncelleme: 2016-01-04
Kullanım Sıklığı: 1
Kalite:
Referans:
i'm working oil drilling contractor engineer
i just finished studying
Son Güncelleme: 2019-07-12
Kullanım Sıklığı: 1
Kalite:
Referans:
sanggup membayar untuk uoah contractor tentang pemasangan i ternet
the rate charged is
Son Güncelleme: 2021-11-15
Kullanım Sıklığı: 1
Kalite:
Referans:
telalu banyak perancah telah di buat untuk contractor yang requested daripada kita
many have made scaffolding and many of us contractor reqeusted
Son Güncelleme: 2015-06-24
Kullanım Sıklığı: 1
Kalite:
Referans:
saya juga pernah bekerja di dalam mckip sebagai sub contractor semasa dalam proses pembinaan mckip pada 2018
i have also worked in mckip as a sub-contractor during the mckip construction process in 2018
Son Güncelleme: 2023-08-08
Kullanım Sıklığı: 1
Kalite:
Referans:
this report is very crucial part because of we must hire competent contractor if we need to increase the amp power supply for this rehab centre
this report is very crucial part because of we must hire competent contractor if we need to increase the amp power supply for this rehab center
Son Güncelleme: 2020-03-25
Kullanım Sıklığı: 1
Kalite:
Referans:
semasa kerja maintenance loading arm, contractor menggunakan sling belt yang sudah expired. meminta contractor untuk stop work dan mencari sling belt yang tidak expired dan elok untuk meneruskan kerja.
during the maintenance work of the loading arm, the contractor uses an already expired belt sling. asking the contractor to stop work and find an unexpired and good sling belt to continue the work.
Son Güncelleme: 2023-09-16
Kullanım Sıklığı: 1
Kalite:
Referans:
those yg didapati membuang sampah selain dari medical equipment akan diambil tindakan – kalau contractor kita tak bagi masuk kerja…. kalau employee kita bagi surat tunjuk sebab.
on employees who default a show-cause letter will be imposed and on the contractor an action not to enter work will be imposed
Son Güncelleme: 2023-08-30
Kullanım Sıklığı: 2
Kalite:
Referans:
fyi, po dah keluar kepada contractor untuk repair roller shutter dekat ware wash, mereka nak lakukan pada minggu ini, bilakah waktu yang sesuai mereka nak melakukan kerja tersebut. mintak kerjasama daripada pihak puan memberi hari dan juga masa untuk memudahkan kontraktor melakukan kerja.
when will your team be able to repair the machine at our permit after 1 dec 2021 has come to check and trouble shoot. can get date and time to come fix.
Son Güncelleme: 2022-01-04
Kullanım Sıklığı: 1
Kalite:
Referans: