Şunu aradınız:: review of method statements (İngilizce - Endonezce)

Bilgisayar çevirisi

İnsan çevirisi örneklerinden çeviri yapmayı öğrenmeye çalışıyor.

English

Indonesian

Bilgi

English

review of method statements

Indonesian

 

Kimden: Makine Çevirisi
Daha iyi bir çeviri öner
Kalite:

İnsan katkıları

Profesyonel çevirmenler, işletmeler, web sayfaları ve erişimin serbest olduğu çeviri havuzlarından.

Çeviri ekle

İngilizce

Endonezce

Bilgi

İngilizce

however, there are calls for peer review of the research.

Endonezce

namun, ada seruan untuk tinjauan sejawat terhadap riset tersebut.

Son Güncelleme: 2020-08-25
Kullanım Sıklığı: 1
Kalite:

İngilizce

in response to the rapidly increasing number of publications on the emerging disease, this article attempts to provide a timely and comprehensive review of the swiftly developing research subject.

Endonezce

sebagai respons terhadap jumlah publikasi yang meningkat cepat tentang penyakit yang baru muncul ini, artikel ini mencoba memberikan tinjauan tepat waktu dan komprehensif tentang subjek penelitian yang berkembang cepat.

Son Güncelleme: 2020-08-25
Kullanım Sıklığı: 1
Kalite:

İngilizce

the main aim of this paper is to (1) present an analytical framework that will support the assessment of a wide range of industrial symbiosis outcomes and aid in research design. the process, in which the study develops the analytical framework, is inspired by the content analysis methodology. and (2), the study will test the analytical framework by applying it in a state of the art review of industrial symbiosis research. the review examines outcomes found in industrial symbiosis research and the process in which outcomes have been identified and derived

Endonezce

tujuan utama dari makalah ini adalah (1) menyajikan kerangka analisis yang akan mendukung penilaian berbagai macam hasil simbiosis industri dan bantuan dalam desain penelitian. proses, di mana studi mengembangkan kerangka kerja analisis, terinspirasi oleh metodologi analisis konten. dan (2), penelitian ini akan menguji kerangka analisis dengan menerapkannya dalam keadaan tinjauan seni penelitian simbiosis industri. tinjauan ini meneliti hasil yang ditemukan dalam penelitian simbiosis industri dan t

Son Güncelleme: 2022-04-05
Kullanım Sıklığı: 1
Kalite:

Referans: Anonim

Benzerlik derecesi düşük bazı insan çevirileri gizlendi.
Benzerlik derecesi düşük olan sonuçları göster.

Daha iyi çeviri için
7,735,076,880 insan katkısından yararlanın

Kullanıcılar yardım istiyor:



Deneyiminizi iyileştirmek için çerezleri kullanıyoruz. Bu siteyi ziyaret etmeye devam ederek çerezleri kullanmamızı kabul etmiş oluyorsunuz. Daha fazla bilgi edinin. Tamam