来自专业的译者、企业、网页和免费的翻译库。
however, there are calls for peer review of the research.
namun, ada seruan untuk tinjauan sejawat terhadap riset tersebut.
最后更新: 2020-08-25
使用频率: 1
质量:
in response to the rapidly increasing number of publications on the emerging disease, this article attempts to provide a timely and comprehensive review of the swiftly developing research subject.
sebagai respons terhadap jumlah publikasi yang meningkat cepat tentang penyakit yang baru muncul ini, artikel ini mencoba memberikan tinjauan tepat waktu dan komprehensif tentang subjek penelitian yang berkembang cepat.
最后更新: 2020-08-25
使用频率: 1
质量:
the main aim of this paper is to (1) present an analytical framework that will support the assessment of a wide range of industrial symbiosis outcomes and aid in research design. the process, in which the study develops the analytical framework, is inspired by the content analysis methodology. and (2), the study will test the analytical framework by applying it in a state of the art review of industrial symbiosis research. the review examines outcomes found in industrial symbiosis research and the process in which outcomes have been identified and derived
tujuan utama dari makalah ini adalah (1) menyajikan kerangka analisis yang akan mendukung penilaian berbagai macam hasil simbiosis industri dan bantuan dalam desain penelitian. proses, di mana studi mengembangkan kerangka kerja analisis, terinspirasi oleh metodologi analisis konten. dan (2), penelitian ini akan menguji kerangka analisis dengan menerapkannya dalam keadaan tinjauan seni penelitian simbiosis industri. tinjauan ini meneliti hasil yang ditemukan dalam penelitian simbiosis industri dan t
最后更新: 2022-04-05
使用频率: 1
质量:
参考:
一些相关性较低的人工翻译已被隐藏。
显示低相关性结果。