来自专业的译者、企业、网页和免费的翻译库。
rujukan kami
your refer
最后更新: 2021-02-17
使用频率: 1
质量:
参考:
ini ialah rujukan kami
claimant
最后更新: 2023-01-05
使用频率: 1
质量:
参考:
sila lampirkan quotation untuk rujukan kami.
quotation as attached
最后更新: 2022-08-10
使用频率: 1
质量:
参考:
sila lampirkan sebut harga untuk rujukan kami
please use our quotation
最后更新: 2023-07-12
使用频率: 1
质量:
参考:
rujukan kami: tnb grid / gm / kl 14/13/1
our reference : tnb grid/gm/kl 14/13/1 date : mac 2018 ahmad fuad md arif general manager (business ventures) grid division rjo costing tripping incident on 26 february 2018 and repairing conductor snapped from 26 february 2018 till 28 february 2018. line involved: i. 132kv kampung lanjut – ampang menara t18 – t19 1.0 objective the objective of this memo is to create rjo costing to g-pile sistem sdn. bhd. who will bear the cost of tripping incident line 132kv kampung lanjut – ampang on 26 february 2018 and repairing work conductor snapped from 26 february 2018 till 28 february 2018. 2.0 background 3.0 0n 26 february 2018, 1319hours, 132kv kampung lanjut-ampang overhead line trip and autoreclose lockout. investigation has been done and tnb found conductor snapped between tower no. 18-19. conductor snapped caused by crane activity owned by g-pile sistem sdn. bhd. in rentice area. claim to bear the cost of the repairing work and normalizing line.. scope / description of work replacement snapped conductor and line normalise done for the lines mentioned above. 4.0 resource costing unit / department / : total margin : detail or workman: costing as is cost template in a1 & a2 5.0 duration period 5.1 3 days 5.2 from 26 february 2018 to 28 februari 2018 prepared by : reviewed by: _____________________________ ____________________________ _____________________________ ____________________________ _____________________________ ____________________________
最后更新: 2018-04-03
使用频率: 1
质量:
参考:
警告:包含不可见的HTML格式