来自专业的译者、企业、网页和免费的翻译库。
malayan pit viper
lifgħa pit tal-malaja
最后更新: 2017-04-06
使用频率: 5
质量:
the dog loves running the pit a lot.
imexmex
最后更新: 2020-06-24
使用频率: 3
质量:
参考:
one piece is larger than one half pit, or
biċċa waħda hija akbar minn nofs għadma, jew
最后更新: 2014-10-18
使用频率: 2
质量:
参考:
visual inspection over a pit or on a hoist.
spezzjoni viżwali fuq fossa jew fuq parank.
最后更新: 2017-04-06
使用频率: 1
质量:
参考:
visual inspection not necessarily on a pit or hoist.
spezzjoni viżwali mhux neċessarjament fuq fossa jew fuq parank.
最后更新: 2017-04-06
使用频率: 1
质量:
参考:
visual inspection with vehicle over a pit or on a hoist.
spezzjoni viżwali bil-vettura fuq fossa fuq parank.
最后更新: 2017-04-06
使用频率: 1
质量:
参考:
visual inspection with the vehicle over a pit or on a hoist.
spezzjoni viżwali bil-vettura fuq fossa jew fuq parank.
最后更新: 2017-04-06
使用频率: 1
质量:
参考:
equipment for scaffolding, shuttering, propping or pit-propping
tagħmir għal armar, strutturi ta’ xaters, irfid u irfid għas-soqfa fejn jitħaffer fil-minjieri (pit-propping)
最后更新: 2014-11-21
使用频率: 3
质量:
参考:
covering the steps into the inspection pit with non-slipping material.
l-għata tajba ta’ l-imħażen u tat-tankijiet ta’ taħt l-art qegħdin f’posthom u f’kondizzjoni tajba?
最后更新: 2014-02-06
使用频率: 1
质量:
参考:
identify and quantify areas of open pit mining and/or mining infrastructures,
jiġu identifikati u kkwantifikati żoni ta’ minjieri fil-beraħ u/jew l-infrastutturi tal-minjieri;
最后更新: 2017-04-06
使用频率: 1
质量:
参考:
excavation of the pit( secant bored pile wall) © robert metsch
taħfir tal-fossa( ħajt tal-pilastri bborjati u mrikkba) © robert metsch
最后更新: 2012-03-19
使用频率: 3
质量:
参考:
pile foundations excavation of the pit( secant bored pile wall) © robert metsch
taħfir tal-fossa( ħajt tal-pilastri bborjati u mrikkba) © robert metsch
最后更新: 2012-03-19
使用频率: 3
质量:
参考:
are at surfaces (floor, inspection pit, etc.) regularly cleaned?
tagĦmir taxxogĦolil-magni kollha huma mgħammra bl-irpari?
最后更新: 2014-02-06
使用频率: 1
质量:
参考:
this involved the excavation of the pit( secant bored pile wall) and construction of the pile foundations.
dan kien jinvolvi t-taħfir tal-fossa( ħajt tal-pilastri bborjati u mrikkba) u l-kostruzzjoni tal-pedamenti bil-pilastri.
最后更新: 2012-03-19
使用频率: 3
质量:
参考:
pit-head winding gear; winches specially designed for underground use; other winches; capstans
tagħmir li jkebbeb iċ-ċimi f’ras il-minjieri; winċijiet maħsuba għall- użu taħt l-art; winċijiet oħrajn; kapstans
最后更新: 2014-11-21
使用频率: 2
质量:
参考:
nace 08.12: operation of gravel and sand pits; mining of clays and kaolin
nace 08.12: operazzjoni ta' fosos taż-żrar u r-ramel; qtugħ ta' tafal u kawlina mill-minjieri
最后更新: 2014-11-21
使用频率: 4
质量:
参考: