From professional translators, enterprises, web pages and freely available translation repositories.
during such price determination phase, no new orders may be entered and existing orders may not be modified or cancelled.
during such price determination phase, no new orders may be entered and existing orders may not be modified or cancelled.
the order that triggered the price to cross the 10 % threshold shall be cancelled and no transaction shall take place.
the order that triggered the price to cross the 10 % threshold shall be cancelled and no transaction shall take place.
orders entered into the order book may be valid for the trading day, until a specified date, or until cancelled, subject to a maximum duration of 365 days.
orders entered into the order book may be valid for the trading day, until a specified date, or until cancelled, subject to a maximum duration of 365 days.
-%quot% advance fixing cancelled in accordance with regulation (eec) no 837/72.%quot%
«advance fixing cancelled in accordance with regulation (eec) nº 837/72.»
Last Update: 2008-03-04
Usage Frequency: 1
Quality:
Reference:
de melding moet vergezeld gaan van een exemplaar van het originele meldingsformulier waarop het woord "cancelled" (“geannuleerd”) is aangebracht.
la notification est accompagnée d'une copie de la notification initiale portant en diagonale la mention «annulÉe».
Last Update: 2017-04-08
Usage Frequency: 1
Quality:
Reference:
Warning: Contains invisible HTML formatting
(i) « fill-and-kill orders », also referred to as « execute-and-eliminate orders », are orders which are executed to the fullest extent possible either immediately upon entry during continuous trading or at the general matching of an auction, with any remaining unexecuted portion being cancelled;
(i) « fill-and-kill orders », also referred to as « execute-and-eliminate orders », are orders which are executed to the fullest extent possible either immediately upon entry during continuous trading or at the general matching of an auction, with any remaining unexecuted portion being cancelled;
Last Update: 2011-10-23
Usage Frequency: 1
Quality:
Reference: