From professional translators, enterprises, web pages and freely available translation repositories.
key secondary endpoints of major bleeding and all cause death were tested in a pre-specified hierarchical testing strategy to control the overall type 1 error in the trial.
sekundære endepunkter for major blødning og mortalitet uanset årsag blev testet i en præspecificeret hierarkisk teststrategi for at kontrollere for den generelle type 1-fejl i studiet.
Last Update: 2017-04-26
Usage Frequency: 1
Quality:
drug treatment and testing order schemesinthe united kingdom drug search facility (http://www.drugscope.org) providedby drugscope in the united kingdom.
foranstaltninger til narkotikabehandlingog -test i det forenede kongerige sikre forhold, blev gjort lovlige i tyskland i februar 2000,og et værested blev indført som et pilotprojekt i madrid,spanien i 2000.
Last Update: 2014-02-06
Usage Frequency: 1
Quality:
total mi includes silent mi, with date of event set to date when discovered. dnominal significance value; all others are formally statistically significant by pre-defined hierarchical testing.
mi i alt inkluderer tavst mi, -dato for hændelsen er sat til dato for konstatering. d nominel signifikansværdi; alle andre er formelt statistisk signifikante ifølge prædefinerede hierarkiske tests.
Last Update: 2017-04-26
Usage Frequency: 1
Quality:
all p-values < 0.001 for all comparisons between xiapex and placebo, except for pip joints in study cord ii which was not eligible for statistical testing due to a hierarchical testing procedure.
alle p-værdier <0,001 for alle sammenligninger mellem xiapex og placebo, med undtagelse af pip led i cord ii studiet som ikke var brugbare til statistisk analyse som følge af en rangordnet testprocedure.
Last Update: 2017-04-26
Usage Frequency: 1
Quality:
Warning: Contains invisible HTML formatting
the trip shall consist of urban driving followed by rural and motorway driving according to the shares specified in paragraphs 4.5.1 to 4.5.4 in the case another testing order is justified for practical reasons and after the agreement of the type approval authority another order of urban, rural and motorway operation may be used.
cyklussen skal bestå af bykørsel efterfulgt af kørsel på landevej og motorvej i overensstemmelse med den fordeling, som er angivet i punkt 4.5.1 til 4.5.4. såfremt en anden prøvningsrækkefølge er begrundet af praktiske hensyn, kan rækkefølgen af by-, landevejs- og motorvejskørsel ændres efter aftale med den godkendende myndighed.
Last Update: 2014-11-21
Usage Frequency: 1
Quality:
Some human translations with low relevance have been hidden.
Show low-relevance results.