Results for project execution plan translation from English to Dutch

English

Translate

project execution plan

Translate

Dutch

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

Dutch

Info

English

execution plan

Dutch

werktekening

Last Update: 2014-11-14
Usage Frequency: 5
Quality:

Reference: IATE

English

1. smooth project execution

Dutch

1. soepele uitvoering van het project

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Reference: IATE

English

project execution stage: duties of coordinators

Dutch

verwezenlijking van het bouwwerk: taken van de cooerdinatoren

Last Update: 2014-10-23
Usage Frequency: 1
Quality:

Reference: IATE

English

streamlining reporting procedures during project execution.

Dutch

de rapporteringsprocedures tijdens de uitvoering van het project worden gestroomlijnd.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

at the project execution stage there are several scenarios.

Dutch

voor de projectuitvoeringsfase bestaan verschillende scenario's.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

coordinator for safety and health matters at the project execution stage

Dutch

coördinator inzake veiligheid en gezondheid tijdens de verwezenlijking van het bouwwerk

Last Update: 2019-05-31
Usage Frequency: 6
Quality:

Reference: IATE

English

in contrast to this, the project execution stage may now involve extra burdens.

Dutch

maar de fase van projectuitvoering kan nu met extra rompslomp gepaard gaan.

Last Update: 2017-04-06
Usage Frequency: 2
Quality:

Reference: IATE

English

the focus remains on improving the quality of the management of the organisation and project execution.

Dutch

de focus blijft gericht op verbetering van de kwaliteit in de aansturing van de organisatie en de uitvoering van projecten.

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Reference: IATE

English

it will be paid annually on the basis of the proposed execution plan.

Dutch

de bijdrage zal jaarlijks worden uitgekeerd op basis van het voorgestelde uitvoeringsplan.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

further savings can be expected through the streamlined reporting procedures that will apply during project execution.

Dutch

er zijn verdere besparingen te verwachten door de toepassing van de gestroomlijnde rapportageprocedures tijdens de uitvoering van projecten.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

quality assurance and control to improve the specification of project objectives as well as project execution and results;

Dutch

kwaliteitsborging en-controle ter verbetering van de specificatie van projectdoelstellingen alsmede van de uitvoering en de resultaten van projecten;

Last Update: 2014-11-15
Usage Frequency: 2
Quality:

Reference: IATE

English

(a) quality assurance and control to improve the specification of project objectives as well as the project execution and results

Dutch

a) kwaliteitsborging en ‑controle ter verbetering van de specificatie van projectdoelstellingen alsmede van de uitvoering en de resultaten van projecten;

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

all the activities carried out in the context of an integrated project will be defined in the general framework of an "execution plan" comprising activities relating to:

Dutch

alle activiteiten in het kader van een geïntegreerd project worden omschreven in het algemene raamwerk van een "uitvoeringsplan", dat activiteiten omvat met betrekking tot:

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE
Warning: Contains invisible HTML formatting

English

it will be paid annually on the basis of the proposed execution plan, and adjusted according to the activities and the financial reports.

Dutch

de bijdrage wordt jaarlijks betaald op basis van het voorgestelde uitvoeringsplan en wordt bijgesteld afhankelijk van de werkzaamheden en de financiële verslagen.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

once a project is awarded clients can expect a thorough and structured way of project execution in which quality and result are of the foremost importance whilst keeping a certain degree of flexibility.

Dutch

opdrachtgevers mogen van adeas een gedegen en gestructureerde projectaanpak verwachten waarin de kwaliteit van het resultaat wordt gewaarborgd.

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Reference: IATE

English

if the safety and health plan has not been drawn up or the coordinator has not been designated before the project execution stage, the obligation to incorporate prevention principles in project preparation has not been met.

Dutch

als vóór de uitvoeringsfase van het project geen veiligheids- en gezondheidsplan is opgesteld en geen coördinator is aangewezen, is niet voldaan aan de verplichting om bij de voorbereiding van het project met de preventiebeginselen rekening te houden.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

the coordinator(s) for safety and health matters during the project execution stage appointed in accordance with article 3 (1) shall:

Dutch

een overeenkomstig artikel 3, lid 1, aangestelde cooerdinator inzake veiligheid en gezondheid tijdens de verwezenlijking van het bouwwerk:

Last Update: 2014-10-23
Usage Frequency: 1
Quality:

Reference: IATE

English

the role of the coordinator under directive 92/57/eec is to coordinate the implementation of various health and safety provisions by those involved in project preparation and project execution stages.

Dutch

de coördinator moet volgens richtlijn 92/57/eeg de uitvoering van de verschillende gezondheids- en veiligheidsbepalingen door degenen die betrokken zijn bij de voorbereiding en de uitvoering van een project coördineren.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

English

he will help drive the specific strategies and execution plans for online gaming expansion within the united states and other global jurisdictions.

Dutch

hij zal helpen rijden de specifieke strategieën en uitvoeringsplannen voor online gaming expansie binnen de verenigde staten en andere wereldwijde rechtsgebieden.

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

Reference: IATE

English

as a rule, project supervisors are familiar with coordinating safety and health matters during project execution but regret that safety is not taken sufficiently into account in the design and preparation, and feel that the responsibilities of the supervisor and the client ought to be more clearly defined.

Dutch

de bouwdirecties zijn in de regel vertrouwd met de coördinatie van de veiligheids- en gezondheidsaangelegenheden tijdens de uitvoering van een project, maar zij betreuren dat bij het ontwerp en de voorbereiding onvoldoende met de veiligheid rekening wordt gehouden en zij vinden dat de verantwoordelijkheden van de bouwdirectie en de opdrachtgever duidelijker moeten worden omschreven.

Last Update: 2017-04-06
Usage Frequency: 1
Quality:

Reference: IATE

Get a better translation with
8,944,435,693 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK