Results for method statement translation from English to French

English

Translate

method statement

Translate

French

Translate
Translate

Instantly translate texts, documents and voice with Lara

Translate now

Human contributions

From professional translators, enterprises, web pages and freely available translation repositories.

Add a translation

English

French

Info

English

method of transacting account statements

French

methode de paiement de factures

Last Update: 2014-11-25
Usage Frequency: 4
Quality:

English

deposit account statement method 4.

French

mÉthode du relevÉ de compte de dÉpÔt 4.

Last Update: 2015-05-14
Usage Frequency: 1
Quality:

English

a statement on recommended methods of use.

French

conseils concernant l'emploi du produit;

Last Update: 2014-11-21
Usage Frequency: 2
Quality:

English

billing statement rendering system and method

French

systeme de rendu de documents de facturation, et procede associe

Last Update: 2014-11-25
Usage Frequency: 4
Quality:

English

"unlawful methods of obtaining a statement.

French

<< méthodes interdites pour obtenir une déclaration.

Last Update: 2016-09-30
Usage Frequency: 2
Quality:

Warning: Contains invisible HTML formatting

English

system and method for producing flexible statements

French

systeme et procede permettant de produire des documents adaptables

Last Update: 2014-11-25
Usage Frequency: 3
Quality:

English

system and method for identification of false statements

French

systeme et procede d&#39;identification de fausses declarations

Last Update: 2014-11-25
Usage Frequency: 4
Quality:

Warning: Contains invisible HTML formatting

English

a method of rendering billing statements is provided.

French

l'invention concerne un procédé de rendu de documents de facturation.

Last Update: 2014-12-03
Usage Frequency: 1
Quality:

English

method for the management of data originating from procedural statements

French

procédé pour gérer des données provenant de déclarations procédurales

Last Update: 2014-11-25
Usage Frequency: 3
Quality:

English

electronic statement, bill presentment and payment system and method

French

systeme de releve, de presentation de facture et de paiement et procede correspondant

Last Update: 2014-11-25
Usage Frequency: 4
Quality:

English

system and method for designing responses for electronic billing statements

French

systeme et procede de conception de reponses a des factures electroniques

Last Update: 2014-11-25
Usage Frequency: 4
Quality:

English

system and method for processing language independent natural language statements

French

systÈme et procÉdÉ pour traiter des dÉclarations en langage naturel indÉpendantes de la langue

Last Update: 2014-11-25
Usage Frequency: 4
Quality:

English

automated statement presentation, adjustment and payment system and method therefor

French

systeme automatise de presentation de releve de compte, de regularisation et de paiement et procede correspondant

Last Update: 2014-11-25
Usage Frequency: 3
Quality:

English

statement prepared using indirect method for operating, investing and financing activities

French

au fonctionnement, aux placements et au financement.

Last Update: 2016-09-30
Usage Frequency: 1
Quality:

English

method and apparatus for optimizing program loops containing omega-invariant statements

French

méthode et appareil pour optimiser des boucles de programme avec des commandes oméga-invariantes

Last Update: 2014-11-25
Usage Frequency: 1
Quality:

English

under dnd’s method of paying ac statements, late payments are eliminated.

French

la méthode de paiement des achats par ca du mdn élimine les paiements en retard.

Last Update: 2015-05-14
Usage Frequency: 1
Quality:

English

computer system and computer-implemented method for creating travel-expense statements

French

système et procédé informatiques pour créer des notes de frais de voyage

Last Update: 2014-11-25
Usage Frequency: 3
Quality:

English

commensurate with our long experience in automotive events, we offer a range of services that encompass creative solutions, equipment supply, operational staffing plus authorship of risk assessment and method statement documentation.

French

a la hauteur de notre longue expérience en matière d'événements automobiles, nous offrons une gamme de services qui couvre à la fois des solutions créatives, la fourniture d'équipements, un personnel opérationnel ainsi qu'une expertise dans le domaine de l'évaluation des risques et la documentation des protocoles de méthode.

Last Update: 2018-02-13
Usage Frequency: 1
Quality:

English

alternative delivery methods statement of what should be observed rating are there better ways of achieving the results?

French

autres méthodes d’exécution description de ce qui doit être observé cote y a-t-il de meilleures façons d’atteindre les résultats?

Last Update: 2015-05-14
Usage Frequency: 1
Quality:

English

topics definitions requirements corrosive effects irritant effects descriptive statements ph test method acid reserve & alkali reserve calculation

French

sujets définitions exigences effets corrosifs effets irritants Énoncés descriptifs méthode d’essai du ph réserve acide et réserve alcaline calculs

Last Update: 2015-05-14
Usage Frequency: 1
Quality:

Warning: Contains invisible HTML formatting

Get a better translation with
10,256,765,826 human contributions

Users are now asking for help:



We use cookies to enhance your experience. By continuing to visit this site you agree to our use of cookies. Learn more. OK